1 January 2021 in Advances in Civil Engineering
Verified
Journal Article
Open access
PDF file
AYAng Yang
Ang Yang
MHMingzhe Han
Mingzhe Han
QZQingcheng Zeng
Qingcheng Zeng
YSyuhui sun
yuhui sun
The construction industry is undergoing a digital revolution due to the emergence of new technologies. A significant trend is that construction projects have been transformed and upgraded to the digital and smart mode in the whole life cycle. As a critical technology for the construction industry’s innovative development, building information modeling (BIM) is widely adopted in building design, construction, and operation. BIM has gained much interest in the research field of smart buildings in recent years. However, the dimensions of BIM and smart building applications have not been explored thoroughly so far. With an in‐depth review of related journal articles published from 1996 to July 2020 on the BIM applications for smart buildings, this paper provides a comprehensive understanding and critical thinking about the nexus of BIM and smart buildings. This paper proposes a framework with three dimensions for the nexus of BIM application in smart buildings, including BIM attributes, project phases, and smart attributes. According to the three dimensions, this paper elaborates on (1) the advantages of BIM for achieving various smartness; (2) applications of BIM in multiple phases of smart buildings; and (3) smart building functions that be achieved with BIM. Based on the analysis of the literature in three dimensions, this paper presents the cross‐analysis of the nexus of BIM and smart buildings. Lastly, this paper proposes the critical insights and implications about the research gaps and research trends: (1) enhancing the interoperability of BIM software; (2) further exploring the role of BIM in the operation and refurbishment phase of smart buildings; (3) paying attention to BIM technology in the field of transportation infrastructure; (4) clarifying the economic benefits of BIM projects; and (5) integrating BIM and other technologies.

1 January 2021 in Complexity
Verified
Journal Article
Open access
PDF file
YLYang Liu
Yang Liu
YSyuhui sun
yuhui sun
AYAng Yang
Ang Yang
JGJing Gao
Jing Gao
The high operation cost of green building, insufficient informationization and automation management capability, and the lack of effective operation cost control seriously restrict the development of the industry and the realization of green goals. In order to solve the problem of insufficient capability of green building operation cost management, based on the digital twin technology in the manufacturing field, we analyze the characteristic requirements and theoretical basis of green building operation cost management for system, propose a green building operation cost management system based on digital twin, and refine the design of each structural layer of this system. It is necessary to set up a series of lines, although it takes a certain amount of time. There are four types of applications, namely, the number of types of applications, the completion of the effective number, the comparison of functions, and the implementation capabilities. The study shows that the proposed system framework can improve the efficiency and quality of green building operation cost management through technology upgrade and process optimization. The implementation of digital twin and human‐machine collaboration is an advanced stage in the development of digital architecture because virtual things and real things, materials, and numbers are mutually promoting processes. The inspiration of this technological view for architecture is that digital twin and human‐machine collaboration not only allow the interaction between virtual and reality and emphasize the feedback of actual construction to virtual simulation but also promote a kind of mutual promotion of human and machine thinking and construction ability.

9 December 2023 in Computers & Security
Verified
Journal Article
Closed access
YCYu Cao
Yu Cao
AYAng Yang
Ang Yang
HLHanning Li
Hanning Li
QZQingcheng Zeng
Qingcheng Zeng
JGJing Gao
Jing Gao

15 July 2022 in Energies
Verified
Journal Article
Open access
PDF file
AYAng Yang
Ang Yang
XMXiangyu Meng
Xiangyu Meng
He HeHe He
He He
LWLiang Wang
Liang Wang
JGJing Gao
Jing Gao
As a critical node of the global transportation network, ports have great potential in promoting transportation emission reduction. Promoting the low-carbon transition of ports by using clean energy is effective. Using hydrogen energy in automated container terminals (ACTs) has become popular in port emission-reduction research. The research object is the main port equipment—the automated rail-mounted container gantry crane (ARMG). This research designs a staged investment decision-making scheme for ARMGs’ hydrogen energy transition. The Internet of Things (IoT) architecture in ACTs collects ARMG equipment operation and carbon emission data. It provides a basis for data acquisition in ARMGs’ hydrogen energy transition. Furthermore, ports can adopt big data technology to analyze the correlation between equipment operation and carbon emissions. Finally, the digital twin platform will visualize the ARMG equipment operation and carbon emission behavior to remote operators. These advanced technologies can achieve status monitoring and simulation prediction, which will support ARMGs’ hydrogen energy transition. However, the ARMGs’ hydrogen energy transition has a long cycle, large investment, and strong variability. Ports should make staged investment decisions based on the digital twin platform’s status monitoring and simulation prediction analysis results. Therefore, this research establishes an optimization model for ARMGs’ low-carbon transition investment decision based on the real options method, and analyzes the staged investment scale and timing of ARMGs’ hydrogen energy transition. The results provide a popularized decision-making scheme for the low-carbon transition of ports’ equipment, which could facilitate the low-carbon transition of ports’ equipment.

4 October 2025 in Algorithms
Verified
Journal Article
Open access
PDF file
YLYi Li
Yi Li
XDXingzhou Deng
Xingzhou Deng
AYAng Yang
Ang Yang
JGJing Gao
Jing Gao
With the escalating global cyber threats, Distributed Denial of Service (DDoS) attacks have become one of the most disruptive and prevalent network attacks. Traditional DDoS detection systems face significant challenges due to the unpredictable nature, diverse protocols, and coupled behavioral patterns of attack traffic. To address this issue, this paper proposes a novel approach for DDoS attack detection by leveraging the Transformer architecture to model both temporal dependencies and behavioral patterns, significantly improving detection accuracy. We utilize the global attention mechanism of the Transformer to effectively capture long-range temporal correlations in network traffic, and the model’s ability to process multiple traffic features simultaneously enables it to identify nonlinear interactions. By reconstructing the CIC-DDoS2019 dataset, we strengthen the representation of attack behaviors, enabling the model to capture dynamic attack patterns and subtle traffic anomalies. This approach represents a key contribution by applying Transformer-based self-attention mechanisms to accurately model DDoS attack traffic, particularly in handling complex and dynamic attack patterns. Experimental results demonstrate that the proposed method achieves 99.9% accuracy, with 100% precision, recall, and F1 score, showcasing its potential for high-precision, low-false-alarm automated DDoS attack detection. This study provides a new solution for real-time DDoS detection and holds significant practical implications for cybersecurity systems.

22 March 2021 in Journal of Advanced Transportation
Verified
Journal Article
Open access
PDF file
AYAng Yang
Ang Yang
YCYu Cao
Yu Cao
KCKang Chen
Kang Chen
QZQingcheng Zeng
Qingcheng Zeng
ZCZigen Chen
Zigen Chen
The quantity of electrical coal transported through the tramp shipping network is increasing due to the high demands. This trend has increased the scheduling difficulty combined with the underdevelopment of the private thermal power plant port. The high coal consumption and low port storage capacity requires the scheduling of the tramp ship to be on a strict time window to ensure the continuous operation of the thermal power plant. The low port unloading capacity often leads to the port congestion and delay of the unloading operation. This paper develops a mixed-integer-programming model for the optimization of the tramp ship scheduling to reduce the total operation cost, including the transportation cost and the unloading waiting cost, and the branch-and-price algorithm is adopted to solve this large-scale model. The model and algorithm are tested with historical operation data from the thermal power plant in the southern coastal areas of China. The optimized scheme significantly reduces the total operation cost by reducing the unloading waiting time and the number of active vessels in certain periods. The results also demonstrate the algorithm improvement in the aspects of the optimization quality and efficiency comparing with the heuristic solution.