Po-Hsun Lin

Prof. Po-Hsun Lin

orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 January 2022 in Journal of Cleaner Production
Verified
Journal Article
Closed access
QTQuynh Thi Phuong Tran
Quynh Thi Phuong Tran
PLPo-Hsun Lin
Po-Hsun Lin

PLPo-Hsun Lin
Po-Hsun Lin
RHRen-Yang Horng
Ren-Yang Horng
SHShu-Fang Hsu
Shu-Fang Hsu
Shiao-Shing ChenShiao-Shing Chen
Shiao-Shing Chen
CHChia-Hua Ho
Chia-Hua Ho
More than 80% of ammonia (NH3) in the steel manufacturing process wastewater is contributed from the coking wastewater, which is usually treated by biological processes. However, the NH3 in the coking wastewater is typically too high for biological treatment due to its inhibitory concentration. Therefore, a two-stage process including a hollow fiber membrane contactor (HFMC) and a modified membrane distillation (MD) system was developed and applied to reduce and recover NH3 from coking wastewater. The objectives of this paper are to evaluate different membrane materials, receiving solutions, and operation parameters for the system, remove NH3 from the coking wastewater to less than 300 mg N/L, which is amenable to the biological process, and recover ammonia solution for reuse. As a result, the polytetrafluoroethylene (PTFE) HFMC using sulfuric acid as a receiving solution can achieve a maximum NH3-N transmembrane flux of 1.67 g N/m2·h at pH of 11.5 and reduce NH3 in the coking wastewater to less than 300 mg N/L. The NH3 in the converted ammonium sulfate ((NH4)2SO4) was then recovered by the modified MD using ice water as the receiving solution to produce ≥3% of ammonia solution for reuse.

8 June 2012 in Biotechnology Journal
Verified
Journal Article
Closed access
PDF file
PLPo-Hsun Lin
Po-Hsun Lin
CTChing‐Wei Tsai
Ching‐Wei Tsai
JWJosephine W. Wu
Josephine W. Wu
RRRuoh‐Chyu Ruaan
Ruoh‐Chyu Ruaan
WCWen‐Yih Chen
Wen‐Yih Chen

21 April 2025 in Colloids and Surfaces A: Physicochemical and Engineering Aspects
Verified
Journal Article
Closed access
KMKiruthika Mariappan
Kiruthika Mariappan
SSSaravana Pandi Sivaji
Saravana Pandi Sivaji
SCShen Ming Chen
Shen Ming Chen
CCChing-Lung Chen
Ching-Lung Chen
PLPo-Hsun Lin
Po-Hsun Lin
CMChinnasamy Mariappan
Chinnasamy Mariappan

7 January 2023 in International Journal of Environmental Science and Technology
Verified
Journal Article
Closed access
PDF file
PLPo-Hsun Lin
Po-Hsun Lin
YSY.-C. Su
Y.-C. Su
CCC.-L. Chen
C.-L. Chen
ITI.-Y. Tsao
I.-Y. Tsao

1 October 2016 in Journal of Environmental Engineering
Verified
Journal Article
Closed access
MYMao-Sung Yeh
Mao-Sung Yeh
HOHsin-Hung Ou
Hsin-Hung Ou
YSYu-Chun Su
Yu-Chun Su
PLPo-Hsun Lin
Po-Hsun Lin
The daily demand of demineralized water (DMW) in electrolytic galvanizing line (EGL) in China Steel Corporation (CSC) reached approximately 1,600 m3 as the production line was fully in operation. However, the wastewater produced from the EGL was discharged into the cold-rolling mill wastewater treatment plant even though it had potential for reclamation. This study provides details of design and parameter optimization of a full-scale wastewater reclamation plant for the EGL. Three wastewater streams including hot water rinse, pickling rinse wastewater, and condensate water from the EGL were selected for reclamation. The full-scale wastewater reclamation plant was constructed to equip with coagulation, flocculation, sedimentation, and filtration for pretreatment, and electrodialysis reversal (EDR) and ion exchange (IX) processes for desalination. The pretreatment process can reduce the total iron concentrations in the wastewater from 40–70 ppm to <0.1 ppm to protect EDR membranes from fouling. Th...