Yan Li

Prof. Yan Li


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 March 2025 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
SPSige Peng
Sige Peng
CLChufei Li
Chufei Li
GLGuanyong Luo
Guanyong Luo
YLYan Li
Yan Li
HPHong Pan
Hong Pan
SLShihua Liang
Shihua Liang

25 June 2022 in International Journal of Disaster Risk Reduction
Verified
Journal Article
Closed access
YLYan Li
Yan Li
WZWan-Huan Zhou
Wan-Huan Zhou
PSPing Shen
Ping Shen

12 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
Luqi WangLuqi Wang
Luqi Wang
JLJinrui Li
Jinrui Li
QYQizhi Ye
Qizhi Ye
YLYan Li
Yan Li
AFAnqi Feng
Anqi Feng
To enhance the application of building information modeling (BIM) in schedule management for engineering projects, improve spatial planning capabilities, and minimize subjective factors in schedule preparation, this paper presents a framework and method for automatic construction schedule planning based on BIM and data-driven approaches under multi-dimensional spatial resource constraints. The method includes data acquisition, construction process reasoning, time parameter calculation, and schedule generation and scheduling. Initially, the construction data from the BIM model and manual input are imported into the reasoning system to establish the logical relationships of the construction process. Construction time parameters and spatial resource requirements are then automatically calculated using MySQL. Subsequently, the spatial layout and resource allocation data exported from the BIM model are compared to assess whether the space meets the project requirements. Finally, a construction schedule that satisfies the space constraints is generated. The method was validated through a case study, demonstrating its effectiveness in automatic schedule planning under human-computer interaction. This study introduces an innovative approach that considers spatial conflicts in the automatic scheduling process, improving planning efficiency and reducing the risk of spatial conflicts on construction sites.

12 November 2024 in Tunnelling and Underground Space Technology
Verified
Journal Article
Closed access
JXJingmin Xu
Jingmin Xu
LZLuorui Zheng
Luorui Zheng
ZYZehui Yu
Zehui Yu
YLYan Li
Yan Li
GCGuojun Cai
Guojun Cai