Jiguo Liu

Dr. Jiguo Liu


Research Focus & Metrics

Academic Career Length

14Years (2013-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
6 June 2025 in Journal of Civil Structural Health Monitoring
Verified
Journal Article
Closed access
PDF file
JLJiguo Liu
Jiguo Liu
QCQinglong Cui
Qinglong Cui
XYXinxin Yang
Xinxin Yang
LYLinsong Yang
Linsong Yang
HWHuaina Wu
Huaina Wu

10 October 2013
Verified
Conference Paper
Closed access
JLJiguo Liu
Jiguo Liu
The Gongbei Tunnel of the Hong Kong - Zhuhai - Macau Bridge Zhuhai Link is a world-class project. Its underground excavated section, passing underneath the Gongbei Port, is crossing strata with very complex engineering geologic conditions. It has the soft-soil characteristics of high compressibility, high thixotropic nature, high sensitivity, high water content, high void ratio and low strength, making the stratum deformation control very difficult. In the totally 255-m-long underground excavated section, the plane alignment is composed of easement curve and circle curve. The advance-support pipe-roofing system is formed around the laminated structure by 36 steel pipes with a diameter of 1620 millimeters. Underground excavation is performed after the water seal curtain is formed by the segmented freezing method applied on the soil bodies between the pipe roofing. This project is the largest pipe-roofing group, long-distance, curved pipe jacking project in the world with unprecedented challenges in terms of design and construction due to its high technical content and great difficulty.

7 July 2026 in Geosciences
Verified
Journal Article
Open access
PDF file
QZQiang Zhao
Qiang Zhao
Xuefeng YanXuefeng Yan
Xuefeng Yan
JLJiguo Liu
Jiguo Liu
SHSheng Huang
Sheng Huang
BMBaosong Ma
Baosong Ma
With the increasing construction of ultra-long tunnels, complex and highly variable geological conditions along tunnel alignments pose major challenges to geological investigation, design, and construction. Conventional vertical drilling mainly provides discrete vertical geological profiles and is limited in its ability to continuously characterize lithological variations, fracture zones, and groundwater conditions along the tunnel axis. To overcome this limitation, this study proposes an integrated investigation approach based on horizontal directional drilling (HDD) for continuous along-axis geological exploration. Using the Tianshan Shengli Tunnel as the geological setting, the technical advantages of HDD for tunnel investigation—including ultra-long reach, ultra-high accuracy, high penetration rate, and strong adaptability—are first summarized. An integrated investigation method is then developed by combining HDD with targeted borehole coring, hydraulic fracturing, comprehensive borehole logging, and borehole TV imaging. A 2271 m long investigation borehole was drilled along the tunnel axis from the portal section. As a result, precise directional control limited the maximum deviation between the HDD borehole trajectory and the tunnel axis to only 6.32 m. Meanwhile, the lag distance between cuttings was determined through theoretical calculations to reconstruct the true borehole positions corresponding to the collected cuttings. Based on XRD mineralogical analysis, macroscopic observations, and preliminary investigation results, the lithology of the tunnel surrounding rock was delineated with high resolution. In addition, daily borehole inflow was monitored, and tunnel inflow during construction was predicted using the groundwater dynamics method and an empirical railway relationship, yielding an expected normal inflow of 4016.6 m3/d and a maximum inflow of 12,049.8 m3/d; furthermore, borehole TV footage was used to accurately locate inflow points and intervals with well-developed joints and fractures within the surrounding rock. Highlights This study proposes an HDD–downhole geophysics method for tunnel investigation, classifies surrounding-rock lithology from cuttings and cores, and predicts tunnel construction inflow from HDD borehole inflow monitoring data.

1 March 2024 in JOURNAL OF SHENZHEN UNIVERSITY SCIENCE AND ENGINEERING
Verified
Journal Article
Open access
PDF file
JLJiguo Liu
Jiguo Liu
TGTao Guo
Tao Guo
BMBaodong Miao
Baodong Miao
WPWenbo Peng
Wenbo Peng
LWLonghai Wei
Longhai Wei
The geological conditions in the western region of China are complex, and many tunnel projects inevitably traverse unfavorable geological sections during construction, facing threats from active faults. To explore the strain response law and deformation failure mechanism of tunnel with flexible joint under strike-slip fault dislocation, with the background of the Shengli tunnel project in the Tianshan mountain, we use optic fiber sensing technology to conduct small-scale indoor model tests to study the deformation and failure of segmented articulated tunnels under strike-slip fault dislocation. The results indicate that the overall fault failure mode of the tunnel is a combination of tension, compression, and shear. And the deformation of the tunnel lining is mainly concentrated in the interior and near the edge of the fault fracture zone. Along the longitudinal direction of the tunnel, the stress mode of the tunnel at the fault fracture zone is generally tensile at the top and bottom of the arch, with both sides being both tensile and compressive. Along the circumferential direction of the cross-section, the circumferential strain distribution shows a "W" shape, with two tensile strain peaks and two compressive strain peaks. The deformation tendency of the section is that both sides are subjected to horizontal compression, forcing the section to develop from horseshoe shape to oval shape. This study reveals the deformation and failure form of tunnel with flexible joint under strike-slip fault dislocation, as well as the deformation patterns of the lining, which can provide theoretical reference and technical support for similar projects in the future.