10 October 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
Irankunda GeorgesIrankunda Georges
Irankunda Georges
WZWei Zhang
Wei Zhang
MFMuhirwa Fernand
Muhirwa Fernand
JZJianrong Zhang
Jianrong Zhang
Given the increasing frequency of natural disasters, which result in substantial damage to critical infrastructures and disrupt the functioning of modern societies, numerous studies have been conducted in recent decades to propose sustainable preventive and enhancement measures to safeguard the environmental and societal development. This paper contributes to the existing literature by introducing a novel environmentally conscious infrastructural resilience assessment approach named the Novel Infrastructure Resilience Assessment Curve (NIRAC). Unlike past works which typically focused on a single infrastructure scenario, the NIRAC is conceptualized around multi-scenario resilience assets, integrating sustainable principles to enhance environmental resilience. Additionally, this paper presents a road infrastructure resilience assessment (RIRA) framework, developed from factors and dimensions pertinent to road infrastructure resilience and environmental sustainability. The RIRA framework is applied to a case study of a road damaged by heavy rains, emphasizing the need for sustainable recovery efforts which minimize environmental impact. The results demonstrate the effectiveness of the RIRA framework in guiding road recovery efforts. The insights provided in this paper are valuable for disaster managers and policymakers, as they extend their resilience assessment knowledge with a focus on sustainable development and environmental protection. This expanded knowledge facilitates the implementation of appropriate interventions to prevent and mitigate the societal consequences of disasters more efficiently.

23 August 2024 in Journal of Building Engineering
Verified
Journal Article
Closed access
MFMuhirwa Fernand
Muhirwa Fernand
YLYaqi Li
Yaqi Li
QQQiwei Qian
Qiwei Qian
YCYin Chi
Yin Chi
ZYZhenjun Yang
Zhenjun Yang

3 February 2025 in Buildings
Verified
Journal Article
Open access
PDF file
Irankunda GeorgesIrankunda Georges
Irankunda Georges
WZWei Zhang
Wei Zhang
UAUsman Isah Abdullahi
Usman Isah Abdullahi
MFMuhirwa Fernand
Muhirwa Fernand
DAVID BYIRINGIRODAVID BYIRINGIRO
DAVID BYIRINGIRO
SJSinamenye Jean-Petit
Sinamenye Jean-Petit
The execution of a construction project faces many potentials challenges, and delays are one of them. Communal construction projects in Burundi (CCP-Burundi projects) were considered as one field that could generate a Burundi government development plan. However, according to the frequency of delays encountered by these projects, at a rate of 70% on average every year, the government’s target seems far from being achieved. As no scientific study exists on how to avoid CCP delays, this paper aims to identify and analyze factors that cause delays in CCP-Burundi and provide related measures to overcome them. Based on a list of fifty delay factors gathered from the National Communal Investment Fund institution FONIC (Fond National d’Investissement Communal), communal annual reports, and the literature, a questionnaire survey was developed and dispersed to CCP stakeholders to collect data about critical factors. The top fifteen factors were identified using a relative importance index and a factor analysis was performed. “Weather conditions” was the top-ranked factor, while “Claims” was the lowest ranked. A structural equation modeling approach was adopted to evaluate influences at the relationship level among delay factor groups. A standardized calculation revealed that Factors During Awarding of Bid (FDABs) positively influence Factors After the Award of Bid (FAABs). The findings were implemented in case studies to assess their efficacy. This paper’s findings could assist upcoming construction practitioners and future researchers aiming to explore construction-related project delays, providing a fundamental understanding of the significant delays encountered in the Burundi construction industry.

10 January 2025 in Engineering Structures
Verified
Journal Article
Closed access
MFMuhirwa Fernand
Muhirwa Fernand
ZYZhenjun Yang
Zhenjun Yang

27 May 2026 in Journal of Testing and Evaluation
Verified
Journal Article
Closed access
Mingjing FangMingjing Fang
Mingjing Fang
SASibomana Amédée
Sibomana Amédée
MFMuhirwa Fernand
Muhirwa Fernand
IPIrakoze Jean Paul
Irakoze Jean Paul
Portland cement concrete pavements (PCCPs) are widely used for their durability, long service life, and ability to withstand heavy traffic. To ensure performance and reduce maintenance costs, regular evaluation of joint load transfer (LT) capacity is essential. Traditional destructive tests (DTs) provide direct LT data but are localized, time-consuming, costly, and damaging to the pavement. In contrast, nondestructive tests (NDTs) allow broader and non-invasive evaluation, though they require careful interpretation. NDT methods can be divided into discrete and continuous testing devices. Discrete devices, such as the Benkelman beam deflectometer and falling weight deflectometer, stop to apply forces and measure deflections at selected locations. Continuous devices, including the rolling dynamic deflectometer (RDD), rolling weight deflectometer (RWD), and traffic speed deflectometer (TSD), measure pavement deflections while moving at traffic speeds. These continuous systems offer significant advantages by enabling large-scale, traffic speed assessment; however, they generate vast datasets that pose challenges in processing, calibration, and test condition sensitivity. Recent advancements are improving the accuracy and efficiency of LT assessment. Modern high-speed deflectometers integrate advanced technologies such as Doppler velocity sensors for real-time monitoring, ground-penetrating radar for subsurface characterization, traffic-induced excitation as an alternative to impulse loading, and machine learning algorithms for automated data processing. Further, artificial intelligence combined with geographic information systems enhances pavement management systems, enabling smarter decision-making and cost-effective maintenance planning. Future developments in LT evaluation are expected to focus on refining RDD, RWD, and TSD technologies, improving calibration protocols, integrating multi-sensor data, and establishing standardized procedures. Special attention should also be given to applying these advanced methods to precast concrete pavements, where joint performance plays a critical role in service life. Overall, emerging NDT solutions offer great potential for more reliable, efficient, and sustainable pavement monitoring.