Quinny Soares Rocha

Dr. Quinny Soares Rocha


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
16 October 2022 in Forests
Verified
Journal Article
Open access
PDF file
DSDanilo Simões
Danilo Simões
FCFelipe Soares Cavalcante
Felipe Soares Cavalcante
Roldão Carlos Andrade LimaRoldão Carlos Andrade Lima
Roldão Carlos Andrade Lima
QRQuinny Soares Rocha
Quinny Soares Rocha
GPGilberto Pereira
Gilberto Pereira
RMRicardo Miyajima
Ricardo Miyajima
Forest road construction projects mainly depend on factors related to terrain physiography, watershed, and wood harvesting. In the whole tree system, wood extraction is the activity most impacted by the density of forest roads, influencing the extraction distance. One of the alternatives is the optimal forest road density approach, which allows for the minimization of wood extraction costs and the optimization of the productive area. Given the above, the objective of this study was to analyze whether the optimal forest road density in areas of forests planted with eucalyptus allows for maximum productivity and the lowest cost of the road-wood extraction binomial in a whole tree system. The technical and economic analysis of wood extraction was based on the study of time, operational efficiency, productivity, and the cost of wood extraction with a grapple skidder. For the optimal forest road density, the cost of the wood extraction activity was considered, as well as the cost of construction, reconstruction, and maintenance of roads. In addition, the cost of a loss of productive area and the cost of excess forest roads were weighted. The optimal forest road density was 30.49 m ha−1 for an average extraction distance of 81.99 m, with the cost of loss of productive area of 0.49 USD m³ and the excess road of 80.19 m, which represented a cost of 978.31 USD ha−1. It is concluded that the optimal forest road density allows for the identification of excess forest roads, allowing for a reduction in the total cost for the implementation of roads. Therefore, it can be considered an essential variable in the planning of the forest road network, providing improvements in productivity and the costs of wood extraction with a grapple skidder.

28 July 2023 in Forests
Verified
Journal Article
Open access
PDF file
Roldão Carlos Andrade LimaRoldão Carlos Andrade Lima
Roldão Carlos Andrade Lima
LMLuciano José Minette
Luciano José Minette
DSDanilo Simões
Danilo Simões
QRQuinny Soares Rocha
Quinny Soares Rocha
RMRicardo Miyajima
Ricardo Miyajima
ASArthur Araújo Silva
Arthur Araújo Silva
The grapple skidder is a self-propelled forestry machine that is used for the extraction of trees in wood harvesting—commonly used in full tree systems. Moving this machine can expose operators to occupational hazards of physical origin, among which whole body vibration stands out. However, the measurement of this risk agent does not have a standard measurement time, being performed for periods of approximately 30 min—disregarding the time of the daily workday. In view of this, it was analyzed whether occupational exposure to whole body vibration transmitted to grapple skidder operators using different measurement times complies with the guidelines for preventative purposes. Thus, measurements of whole-body vibration were carried out along three orthogonal axes over a period of one hour and over a daily workday of eight hours—by which were measured the daily (8 h) vibration exposure for the l-axis and the vibration value. The acceleration values in the three evaluated axes were higher for the daily working day, denoting the influence of the measurement time. In addition, the vibration dose value resulted in values above the action limit for both evaluations; however, the daily workload was highlighted—indicating the presence of higher vibration peaks over a longer measurement time. Thus, the assertiveness and influence of measurement times over the daily working day for whole-body vibration transmitted to grapple skidder operators is evidenced.