Dima Jawad

Dr. Dima Jawad

orcid

Research Focus & Metrics

Academic Career Length

13Years (2014-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
Verified
Journal Article
Open access
PDF file
Francesco RouhanaFrancesco Rouhana
Francesco Rouhana
DJDima Jawad
Dima Jawad
Critical transportation networks in developing countries often lack structural robustness and functional redundancy due to insufficient planning and preparedness. These deficiencies increase vulnerability to disruptions and impede effective post-disaster response and recovery. Understanding how such networks perform under stress is essential to improving resilience in hazard-prone urban environments. This paper presents an integrated predictive methodology for assessing the operational resilience of urban transportation networks under extreme events, specifically tailored to data-scarce and high-risk contexts. By combining Geographic Information Systems (GISs) with complex network theory, the framework captures both spatial and topological dependencies. The methodology is applied to Beirut, the capital of Lebanon, a densely populated and disaster-prone Mediterranean city, through scenario-based simulations that account for interdependent stressors such as traffic dynamics, structural fragility, and geophysical hazards. Results reveal that the network exhibits low redundancy and high sensitivity to even minor disruptions, leading to rapid performance degradation. These findings indicate that the network should be classified as highly vulnerable. The study offers a robust framework for assessing infrastructure resilience and supporting evidence-based decision-making in critical urban network management.

1 September 2021 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
CHClaudette El Hajj
Claudette El Hajj
DJDima Jawad
Dima Jawad
German Martinez-MontesGerman Martinez-Montes
German Martinez-Montes
With about $10 trillion spent on construction-related goods and services every year worldwide, advancing the construction industry, one of the largest sectors in the world economy, becomes crucial. Diffusing building information modeling (BIM), one noticeable advancement in construction process modeling, has been the objective of many academic studies as well as state-of-the-review literature. Deviating from approaches of other studies, this research paper presents a novel conceptual analysis and a critical review of the barriers to BIM adoption in the construction industry. This study looks first at the mechanisms of BIM diffusion by performing comparative analyzes between various construction innovative solutions (lean construction, Six Sigma, and IPD) to identify the similarities and the differences in their adoption approaches. Then, BIM barriers are analyzed based on the sociotechnical theory which categorizes the influencing factors along four dimensions: people, tasks, structures, and organization. The results highlight substantial resemblance among the adoption approaches of various innovative concepts mainly in two aspects, people and tasks, pointing out that spreading the knowledge of a new methodology, examining the participants’ attitude and mindset towards it, and deciding on the adoption process based on the financial recourses and the human skills necessary for the adoption of any concept. Additionally, the study shows that BIM barriers are established mainly by the social behavior of practitioners and the social measures of the construction sector, indicating that social variables (people and structure) are responsible for the largest portion of implementation failures due to the cruciality of human decisions. Moreover, the study clearly demonstrates that the impact dimension of a limitation is not identical to its root cause dimension.

11 October 2024 in Buildings
Verified
Journal Article
Open access
PDF file
MBMarie-Belle Boutros
Marie-Belle Boutros
CHClaudette Hajj
Claudette Hajj
DJDima Jawad
Dima Jawad
German Martinez-MontesGerman Martinez-Montes
German Martinez-Montes
The risk–benefit analysis of ERP implementation is worth investigating to optimize the efficiency of ERP deployment in the construction sector. This study investigates the factors affecting the dissipation of ERP through diffusion models in developing countries. Moreover, it suggests a strategy to adopt ERP modules that optimize process integration and project efficiency through the priority factors method. According to the study, the internal model best describes the studied modules, and it suggests that imitative behavior and word of mouth significantly influence ERP adoption in the Africa and Middle East regions. This research concludes with an optimized order for deploying ERP modules based on the importance, urgency, and ease of implementation of each module. It is as follows: work progress (500), budgeting (405), procurement (343), site operations (280), planning and scheduling (270), accounting (252), inventory management (126), document control (90), and tendering (6). Therefore, it can be concluded that this study fills the research gap of ERP module adoption using diffusion models and priority factors within the construction industry, specifically in the specified regions. However, considering dynamic influence factors might provide more precise predictions, while involving a greater number of companies’ owners might highlight a greater importance of external factors.

1 February 2023
Verified
Conference Paper
Open access
PDF file
MBMarie-Belle Fawzi Boutros Boutros
Marie-Belle Fawzi Boutros Boutros
DJDima Jawad
Dima Jawad
SGSophia Ghanimeh
Sophia Ghanimeh
Construction Enterprise Resource Planning (CERP) systems started to infiltrate the construction world after ERPs became crucial in modern enterprises. In simple terms, CERP integrate and keep track of the various processes within construction companies. As a minimum, these possess include management of general contractors, subcontractors, financial work, accounting, payroll, logistics, workflow processes ... data related to different processes are stored within one unique database. Despite this intuitive objective, developing and standardizing CERP systems to fit the needs of all construction companies is not a straightforward course. This research focuses on the development of a framework that integrates the minimum required modules to be included within a CERP, specifically for road and infrastructure construction companies. This objective is achieved based on literature review on CERP despite its shortage, in-depth interviews with construction professionals requiring CERP, and the results of a structured questionnaire filled by CERP users and developers. The developed framework identifies the procurement module linked to the on-site deliveries as the first stone that should be developed and implemented. Then, budgeting and work progress modules must be added. After that, timesheet and equipment follow-up modules need to be implemented. Limitations encountered highlighted the main considerations to be considered in future work such as the cost, the company's size, development and implementation period, and type of work.

24 October 2017
Verified
Conference Paper
Closed access
PSPamela Semaan
Pamela Semaan
MMMirella Abdel Massih
Mirella Abdel Massih
MCMario Chalouhy
Mario Chalouhy
SGSophia Ghanimeh
Sophia Ghanimeh
DJDima Jawad
Dima Jawad
Among various methods used to quantify the impacts of the construction industry, this study considers cradle-to-grave life cycle assessment (LCA) of Portland cement concrete (PCC); in specific, the application of a LCA to concrete production in developing nations, focusing on the country of Lebanon. To the best of our knowledge, this is the first attempt to quantify the emissions of PCC industry in Lebanon, requiring extensive data collection. This work complies to the ISO 14040 and ISO 14044 standards and covers the life cycle starting with raw material extraction and ending with the demolition of a concrete structure. Emissions during the life span of the concrete structure are excluded. Four impact categories were addressed: global warming potential (GWP), photochemical oxidant creation potential (POCP), eutrophication potential (EP), and acidification potential (AP), in addition to energy demand. Local data was collected, via direct contact with: mixing plant operators, cement factory administrators, and fuel importing companies. The results of LCA indicated that 1 m3 of concrete contributed to 348 kg CO2-eq in GWP, 87 g Ethylene-eq in POCP, 61 g PO4-eq in EP, and 1.63 kg SO2-eq in AP. Conforming to research in other regions, it was found that cement production phase in the PCC life cycle is responsible for the majority of emissions, contributing to 307 kg CO2-eq in GWP, 59 g Ethylene-eq in POCP, 32 g PO4-eq in EP, and 1.25 kg SO2-eq in AP, always per m3 of concrete.

13 December 2018
Verified
Conference Paper
Closed access
DJDima Jawad
Dima Jawad
YMYara Medawar
Yara Medawar
SGSophia Ghanimeh
Sophia Ghanimeh
In the field of infrastructure planning and management, utilizing life cycle cost analysis (LCCA) is considered a mandatory requisite for achieving the sustainability of our infrastructure facilities. Even though LCCA model is readily available in textbooks, yet applying LCCA is never a simple routine. Reviewing academic literature and industry guidelines yields wide ranging models of LCCA. One of the main reasons for this disparity is that advancement in analyzing the performance and the impacts of different types of infrastructure facilities has progressed at different levels. This paper presents a general framework and guidelines for conducting LCCA for infrastructure facilities. The main aim of this framework is to guide practitioners in infrastructure management in applying this technique; but in due course, the comparative analysis between different types of infrastructure facilities presented will underline deficiencies and snags in applying LCCA and further drive besought research and advancement.