Kaichen Ying

Dr. Kaichen Ying

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 August 2025 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
ZYZhigang Yao
Zhigang Yao
HLHu Luo
Hu Luo
JHJunyang He
Junyang He
KYKaichen Ying
Kaichen Ying
TYTao Yu
Tao Yu
Yong FangYong Fang
Yong Fang

24 September 2024 in Buildings
Verified
Journal Article
Open access
PDF file
JCJian Cui
Jian Cui
ZYZhigang Yao
Zhigang Yao
TYTao Yu
Tao Yu
JWJianfeng Wang
Jianfeng Wang
KYKaichen Ying
Kaichen Ying
XYXiaonan Yan
Xiaonan Yan
Due to its inherent advantages, shield tunnelling has become the primary construction method for urban tunnels, such as high-speed railway and metro tunnels. However, there are numerous technical challenges to shield tunnelling in complex geological conditions. Under the disturbance induced by shield tunnelling, sandy pebble soil is highly susceptible to ground loss and disturbance, which may subsequently lead to the risk of surface collapse. In this paper, large-diameter slurry shield tunnelling in sandy pebble soil is the engineering background. A combination of field monitoring and numerical simulation is employed to analyze tunnelling parameters, surface settlement, and deep soil horizontal displacement. The patterns of ground disturbance induced by shield tunnelling in sandy pebble soil are explored. The findings reveal that slurry pressure, shield thrust, and cutterhead torque exhibit a strong correlation during shield tunnelling. In silty clay sections, surface settlement values fluctuate significantly, while in sandy pebble soil, the settlement remains relatively stable. The longitudinal horizontal displacement of deep soil is significantly greater than the transverse horizontal displacement. In order to improve the surface settlement troughs obtained by numerical simulation, a cross-anisotropic constitutive model is used to account for the anisotropy of the soil. A sensitivity analysis of the cross-anisotropy parameter α was performed, revealing that as α increases, the maximum vertical displacement of the ground surface gradually decreases, but the rate of decrease slows down and tends to level off. Conversely, as the cross-anisotropy parameter α decreases, the width of the settlement trough narrows, improving the settlement trough profile.

9 September 2026 in Transportation Infrastructure Geotechnology
Verified
Journal Article
Closed access
PDF file
NANorman Burua Adriko
Norman Burua Adriko
KYKaichen Ying
Kaichen Ying
AKArif Khan
Arif Khan
MMMark Miller
Mark Miller

15 October 2025 in Scientific Reports
Verified
Journal Article
Open access
PDF file
NANorman Burua Adriko
Norman Burua Adriko
YFYong Fang
Yong Fang
KYKaichen Ying
Kaichen Ying
AKArif Khan
Arif Khan
Soil–structure interactions commonly induce displacements, with settlements in weak soils becoming increasingly significant under growing urbanization, making it important to minimize them to prevent structural defects. This study investigated the influence of tunnel–pile configurations on ground settlement during tunnel construction at Zhongshan Road with an undercrossing, using numerical simulation. Prediction functions describing settlement behavior within the model were developed and proposed. The Mohr–Coulomb (MC) model in MIDAS GTS NX was employed to simulate settlement levels of a semicircular tunnel lining and surrounding soil under various pile setups, in order to identify the most effective configuration for ground improvement. Results showed substantial variations in vertical settlement. The designed 5 × 4 m pile setup produced the highest crown settlement, increasing it by 32–47% longitudinally along the tunnel compared to the case without piles, while reducing lining uplift by only 138–165%. In contrast, the 4 × 4 m pile arrangement performed best overall, reducing uplift by 184–194% and limiting settlement fluctuations to − 12% to − 47%, maintaining values within 5–10 mm along the 80 m tunnel length. The 4 × 4 m pile setup was therefore more reliable and less variable in both settlement and uplift. Uniform pile arrangements provided smoother settlement troughs than non-uniform setups. Furthermore, prediction formulas based on Gaussian functions, using parameters n and k, reliably estimated settlement for greenfield conditions and projected behavior for tunnel undercrossings. The greenfield prediction function was validated against 12 existing projects, with n values within \(\pm 1.4\) prediction and back-calculated settlements closely matching observed settlements