Paul Remmler

Mr. Paul Remmler

orcid

Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 October 2024 in Sensors
Verified
Journal Article
Open access
PDF file
Andreas JechowAndreas Jechow
Andreas Jechow
JBJan Bumberger
Jan Bumberger
BPBert Palm
Bert Palm
PRPaul Remmler
Paul Remmler
GSGünter Schreck
Günter Schreck
FHFranz Hölker
Franz Hölker
In recent decades, inland water remote sensing has seen growing interest and very strong development. This includes improved spatial resolution, increased revisiting times, advanced multispectral sensors and recently even hyperspectral sensors. However, inland waters are more challenging than oceanic waters due to their higher complexity of optically active constituents and stronger adjacency effects due to their small size and nearby vegetation and built structures. Thus, bio-optical modeling of inland waters requires higher ground-truthing efforts. Large-scale ground-based sensor networks that are robust, self-sufficient, non-maintenance-intensive and low-cost could assist this otherwise labor-intensive task. Furthermore, most existing sensor systems are rather expensive, precluding their employability. Recently, low-cost mini-spectrometers have become widely available, which could potentially solve this issue. In this study, we analyze the characteristics of such a mini-spectrometer, the Hamamatsu C12880MA, and test it regarding its application in measuring water-leaving radiance near the surface. Overall, the measurements performed in the laboratory and in the field show that the system is very suitable for the targeted application.

3 December 2023
Verified
Book Chapter
Open access
PDF file
KRKarsten Rink
Karsten Rink
RGRüdiger Grimm
Rüdiger Grimm
NHNele Hastreiter
Nele Hastreiter
PKPaula Kroll
Paula Kroll
PRPaul Remmler
Paul Remmler
HZH. Konstanze Zschoke
H. Konstanze Zschoke
Zusammenfassung: Nachdem in den vergangenen Kapiteln ausführlich die Abläufe bei der Erkundung, dem Monitoring sowie der Simulation des Untergrundes und der Haustechnik beschrieben wurden, werden nun in Abschn. 7.1 Möglichkeiten zur Verwendung der erhobenen und generierten Daten für die Entwicklung eines prototypischen Informationssystems dargestellt. Die Nutzung der gewonnenen Erkenntnisse für die Gestaltung eines Entscheidungshilfesystems wird in Abschn. 7.2 für den gesamten Prozess von der Grundlagenplanung und Machbarkeitsprüfung über die einzelnen Planungs- und Genehmigungsschritte bis zur Objektbetreuung nach der Implementation beschrieben. Abschn. 7.3 zeigt auf, in welchem Maße sich gesetzliche Vorgaben derzeit für die Anlagenplanung in Deutschland zwischen den einzelnen Bundesländern unterscheiden und gibt Empfehlungen zur Anpassung ebendieser regulativen Rahmenbedingungen.