Kyriakos Panagiotis Andresakis

Mr. Kyriakos Panagiotis Andresakis


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 November 2024 in Energies
Verified
Journal Article
Open access
PDF file
Christos HadjichristofiChristos Hadjichristofi
Christos Hadjichristofi
Spiridon Alexandros DiochnosSpiridon Alexandros Diochnos
Spiridon Alexandros Diochnos
KAKyriakos Panagiotis Andresakis
Kyriakos Panagiotis Andresakis
Vassilios VescoukisVassilios Vescoukis
Vassilios Vescoukis
The management of energy market data, such as load, production, forecasts, and prices, is critical for energy market participants, who develop in-house energy data infrastructure services to aggregate data from many sources to support their business operations. Energy data management frequently involves time sensitive operations, including rapid data ingestion, real-time querying, filling in gaps from missing or delayed data, and updating large volumes of timestamped and loosely structured data, all of which demand high processing power. Traditional relational database management systems (RDBMSs) often struggle with these operations, whereas time series databases (TSDBs) appear to be a more efficient solution, providing enhanced scalability, reliability, real-time data availability and superior performance. This paper examines the advantages of TSDBs over RDBMS for energy data management, demonstrating that TSDBs can either replace or complement RDBMSs. We present quantitative improvements in digestion, integration, architecture, and performance, demonstrating that operations such as importing and querying time-series energy data, along with the overall system’s efficiency, can be significantly improved, achieving up to 100 times faster operations compared to relational databases, all without requiring extensive modifications to the existing information system’s architecture.

19 October 2026 in Energies
Verified
Journal Article
Open access
PDF file
Aris DimeasAris Dimeas
Aris Dimeas
KAKyriakos Panagiotis Andresakis
Kyriakos Panagiotis Andresakis
AGAndreas Gatos
Andreas Gatos
GKGeorge Kiokes
George Kiokes
Distribution network reconfiguration requires switch-state decisions subject to topological and electrical constraints. This paper presents a graph-based surrogate with rooted-forest repair for a modified IEEE 69-bus, two-substation system. The model combines local graph propagation, node-index embeddings, global self-attention, multi-task prediction and physics-informed regularization. The model uses bus-level demand, distributed generation, network data and pre-decision electrical quantities, without including global scenario-scaling factors or the source-cost ratio as input features. The dataset contains 10,000 scenarios at a fixed source-cost ratio of 1.30. On 1500 held-out scenarios, the evaluated model achieved 100% repaired topological feasibility, 79.87% open-switch F1 and 24.93% exact-topology accuracy. A descriptive summary of five training runs yielded 80.09 ± 0.28% and 25.91 ± 0.90%, respectively. Mean inference-plus-repair time was 11.08 ms, compared with 0.151 s for Gurobi over 100 cases. Component-wise AC checks converged for 297 of 300 learned topologies, with no observed voltage or branch apparent-power violations among converged cases under relaxed source limits. The results support fast prediction with topological repair on this benchmark; source-capacity feasibility and optimality are not established by these checks.