Zhangchi Sun

Mr. Zhangchi Sun


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
29 October 2024 in Energies
Verified
Journal Article
Open access
PDF file
WYWenlin Yuan
Wenlin Yuan
ZSZhangchi Sun
Zhangchi Sun
Integrating photovoltaic power stations into large-capacity hydropower stations is an efficient and promising method for regulating large-scale photovoltaic power generation. However, constrained by the time step length, traditional long-term scheduling of hydro-PV hybrid systems does not adequately consider short-term operational performance indicators, resulting in sub-optimal scheduling plans that fail to coordinate the consumption of photovoltaic power and the utilization of water resources in the basin. To address this, this study established a long-term optimal scheduling model for hydro-PV hybrid systems. This model overcomes the limitation of the time step length in long-term scheduling by incorporating long-term power generation goals and short-term operation performance targets into the long-term optimal scheduling process based on scheduling auxiliary functions. In case studies, the optimised model balanced the long-term power-generation goals and short-term operational performance targets by redistributing energy across different periods. Compared to optimization models that did not consider short-term operation performance, in a typical normal year, the model effectively reduced the electricity curtailment volume (28.54%) and power shortage volume (10.91%) of the hybrid system while increasing on-grid electricity (0.03%). Similar improvements were observed in wet and dry years. These findings provide decision support for hydropower scheduling in the context of large-scale photovoltaic power integration.