Ondřej Vystavěl

Mr. Ondřej Vystavěl


Research Focus & Metrics

Academic Career Length

5Years (2022-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 April 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DBDalibor Bartoněk
Dalibor Bartoněk
JBJiri Bures
Jiri Bures
OVOndrej Vystavel
Ondrej Vystavel
RHRadomir Havlicek
Radomir Havlicek
Building Information Modelling (BIM) is a modern approach to managing the process of preparation, realization and operation of building objects including their documentation throughout their life cycle, based on database agenda platform. The aim of our research is to analyze and innovate existing engineering procedures with the aim: 1. to remodel the existing CAD documentation into BIM for the purpose of public procurement, 2. to provide guaranteed data to the IS of the Digital Map of Public Administration and 3. to provide data for the design of new railway structures or their reconstruction. The aim of the case study was to evaluate the effectiveness of remodelling the existing as-built documentation of a railway construction into a common BIM data environment (CDE), in which further subsequent construction agenda should be managed for the remaining period of its life cycle. Using the documentation for construction realization of the railway station Šumice, this 3D documentation was remodeled into the BIM data environment CDE and alternatively also into the 2D GIS environment. The BIM data standard developed by the State Fund for Transport Infrastructure was analyzed during the documentation reworking. An important parameter of the documentation rework was the use of a geodetic reference system fully compatible with the cadastral system in the Czech Republic. It turned out that the general data standard is only partially applicable for railway structures containing many special objects and many objects requiring individual classification. The remodelling of existing graphical data proved faster and more efficient in a GIS environment (layer oriented) compared to the need for 3D remodelling in a BIM CDE (object oriented). Experimental results have demonstrated the effectiveness of remodelling underground technical infrastructure objects, while the visible surface situation is often more effectively captured by current progressive bulk data acquisition technologies. In a CDE environment, existing as-built documentation data can be efficiently stored and administered and progressively, for the procurement and execution of construction, purposefully remodeled only to the extent required in BIM or converted into an exchangeable Digital Technical Map (DTM) format for public administration.

25 October 2024 in Forests
Verified
Journal Article
Open access
PDF file
Tomáš MikitaTomáš Mikita
Tomáš Mikita
Marian RybanskyMarian Rybansky
Marian Rybansky
DKDominika Krausková
Dominika Krausková
FDFilip Dohnal
Filip Dohnal
OVOndrej Vystavel
Ondrej Vystavel
SHSabina Hollmannová
Sabina Hollmannová
This study aims to evaluate the feasibility of using non-contact data collection methods—specifically, UAV (unmanned aerial vehicle)-based and terrestrial laser scanning technologies—to assess forest stand passability, which is crucial for military operations. The research was conducted in a mixed forest stand in the Březina military training area, where the position of trees and their DBHs (Diameter Breast Heights) were recorded. The study compared the effectiveness of different methods, including UAV RGB imaging, UAV-LiDAR, and handheld mobile laser scanning (HMLS), in detecting tree positions and estimating DBH. The results indicate that HMLS data provided the highest number of detected trees and the most accurate positioning relative to the reference measurements. UAV-LiDAR showed better tree detection compared to UAV RGB imaging, though both aerial methods struggled with canopy penetration in densely structured forests. The study also found significant variability in DBH estimation, especially in complex forest stands, highlighting the challenges of accurate tree detection in diverse environments. The findings suggest that while current non-contact methods show promise, further refinement and integration of data sources are necessary to improve their applicability for assessing forest passability in military or rescue contexts.

24 January 2026 in Measurement
Verified
Journal Article
Open access
Marian RybanskyMarian Rybansky
Marian Rybansky
VKVlastimil Kratochvil
Vlastimil Kratochvil
FDFilip Dohnal
Filip Dohnal
OVOndrej Vystavel
Ondrej Vystavel

13 April 2024 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JBJiri Bures
Jiri Bures
OVOndrej Vystavel
Ondrej Vystavel
DBDalibor Bartoněk
Dalibor Bartoněk
LBLadislav Barta
Ladislav Barta
RHRadomir Havlicek
Radomir Havlicek
This article deals with the analysis of the accuracy of the geodetic real-time GNSS measurement procedure used in railway operating conditions in the Czech Republic. The purpose was to determine to what extent the operating conditions affect the accuracy of the measurement result and whether an accuracy of standard deviation σx,y = 5 mm in the horizontal plane could be achieved. The use of geodetic GNSS equipment with an IMU unit was also tested. The accuracy obtained in operational conditions is compared with the accuracy obtained on a calibration base using the same measurement procedure. The consistency between the accuracy of the primary system (satellite-based) and the secondary system (terrestrially measured by the traverse method) is also discussed. The analysis includes the issue of residual inhomogeneities of the uniform transformation key when converted to the Czech national coordinate system S-JTSK. It is shown that a homogeneous accuracy in coordinate standard deviation better than σx,y = 5 mm can be achieved. The results indicate that the accuracy under operational conditions is two–three times worse than the accuracy achieved by the same procedure under ideal conditions on a calibration base. This is due to the non-ideal observing conditions, i.e., horizon occlusion by overlays, surrounding vegetation and multipath effects. It has been shown that the effect of multipath can be reduced by repeating short observations 3–4 h apart. Older GNSS instruments using an IMU unit in combination with an electronic compass (eCompass) are at risk of a systematic bias of up to several tens of millimeters, which can be detected by rotating the antenna by 180°. The current uniform transformation key used in the Czech Republic for the conversion of GNSS coordinates into the national system has residual geometric inhomogeneities (p = 0.90 to 10 mm/km, sporadically up to 20 mm/km), which metrologically deteriorate the results of the calculation of the terrestrially measured secondary system inserted into the GNSS measured primary system. Achieving homogeneous accuracy in coordinate standard deviation in a horizontal plane better than σx,y = 5 mm has been demonstrated in non-ideal railway operating conditions with increased risk of multipath. The innovative aspect of the approach used is that it simplifies and thus increases the efficiency of the measurement with respect to the availability of GPS, GLONASS, Galileo and BeiDou satellites, as well as reducing the effect of multipath on the noise by repeating the measurement procedure.

30 December 2022 in Geoinformatica Polonica
Verified
Journal Article
Open access
PDF file
OVOndrej Vystavel
Ondrej Vystavel
The Use of BIM in Transport Infrastucture Construction in the Czech Republic

3 February 2026
Verified
Book Chapter
Closed access
JBJiří Bureš
Jiří Bureš
LBLadislav Bárta
Ladislav Bárta
OVOndrej Vystavel
Ondrej Vystavel
JKJan Koláček
Jan Koláček
RNRadim Nečas
Radim Nečas