The frequent occurrence of natural disasters and malicious attacks has exerted unprecedented disturbances on power systems, accounting for the extensive attention paid to power system resilience. Combined with the evolving nature of general disasters, this paper proposes resilience assessment approaches for power systems under a tri-stage framework. The pre-disaster toughness is proposed to quantify the robustness of power systems against potential disasters, where the thinking of area division and partitioned multi-objective risk method (PMRM) is introduced. In the case of information deficiency caused by disasters, the during-disaster resistance to disturbance is calculated to reflect the real-time system running state by state estimation (SE). The post-disaster restoration ability consists of response ability, restoration efficiency and restoration economy, which is evaluated by Sequential Monte-Carlo Simulation to simulate the system restoration process. Further, a synthetic metric system is presented to quantify the resilience performance of power systems from the above three aspects. The proposed approaches and framework are validated on the IEEE RTS 79 system, and helpful conclusions are drawn from extensive case studies.
How to restore the load of power system after disasters, especially to guarantee the power supply of the important load, is a significant segment of the research on power system resilience. Nowadays, quantities of research existing has been done to reduce the load loss after disasters. However, there is no clear methodologies or metrics available to evaluate the effects of restoration strategies. Here, a method for evaluating the recovery and economic efficiency of the power system post‐disaster recovery strategy is explored, and assessment metrics related are defined. The method considers the repair and recovery process of transmission lines, generators, and the distributed generation at load nodes. After given the repair strategies, components state sampling and system power flow calculation will be conducted to analyse the running state of the system, then simulate the component repair and the load recovery procedure, and finally calculate corresponding metrics. This novel method can obtain and compare the expected effects of different restoration strategies in advance, providing more reliable reference information for system decision makers. Finally, the proposed method is applied to IEEE 14‐bus system and verifies its effectiveness and application value.