Jakub Wójcik

Mr. Jakub Wójcik


Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 November 2024 in Energies
Verified
Journal Article
Open access
PDF file
Tomasz SiostrzonekTomasz Siostrzonek
Tomasz Siostrzonek
JWJakub Wójcik
Jakub Wójcik
MDMateusz Dutka
Mateusz Dutka
WSWojciech Siostrzonek
Wojciech Siostrzonek
There are currently more than 30 underground mines operating in Poland. These are mines extracting hard coal, salt, and metal ores. Each of these plants has its own specifics for operation, but all operate under the same regulations. The basic principle is to ensure the safety of the crew and equipment. The progressive mechanization and automation of the mining process results in the installation of power electronic converters in the networks of mining plants, which significantly deteriorate the quality of the power in the plant supply networks. In addition, the constant reconfiguration of these networks related to the progress of the work can affect the safety conditions of the plant. This article describes problems occurring at one underground mining plant that are related to the structure of the power grid. Failures and interruptions in the production process were the result of poor power quality. They directly translated into increased production costs and significantly affected the safety level of the workforce, which could result in further consequences, not only in the financial sphere. The article also addresses the issue of existing legal regulations, the provisions of which may be insufficient in assessing the current state of power quality in mining plants.