The solid-state transformer (SST) is an interface device between ac distribution grids and dc distribution systems. The SST consists of a cascaded multilevel ac/dc rectifier stage, a dual active bridge (DAB) converter stage with high-frequency transformers to provide a regulated 400-V dc distribution, and an optional dc/ac stage that can be connected to the 400-V dc bus to provide residential 120/240 V $_{\rm ac}$. However, due to dc-link voltage and power unbalance in the cascaded modules, the unbalanced dc-link voltages and power increase the stress of the semiconductor devices and cause overvoltage or overcurrent issues. This paper proposes a new voltage and power balance control for the cascaded H-Bridge converter-based SST. Based on the single-phase dq model, a novel voltage and the power control strategy is proposed to balance the rectifier capacitor voltages and the real power through parallel DAB modules. Furthermore, the intrinsic power constraints of the cascaded H-Bridge voltage balance control are derived and analyzed. With the proposed control methods, the dc-link voltage and the real power through each module can be balanced. The SST switching model simulation and the prototype experiments are presented to verify the performance of the proposed voltage and power balance controller.
9 August 2010 in IEEE Transactions on Sustainable Energy
Integrating a battery energy storage system (BESS) with a solar photovoltaic (PV) system or a wind farm can make these intermittent renewable energy sources more dispatchable. This paper focuses on the development of a control strategy for optimal use of the BESS for this purpose. The paper considers a rule-based control scheme, which is the solution of the optimal control problem defined, to incorporate the operating constraints of the BESS, such as state of charge limits, charge/discharge current limits, and lifetime. The goal of the control is to have the BESS provide as much smoothing as possible so that the renewable resource can be dispatched on an hourly basis based on the forecasted solar/wind conditions. The effectiveness of this control strategy has been tested by using an actual PV system and wind farm data and it is shown that the BESS can indeed help to cope with variability in wind's and solar's generation.
10 June 2009 in IEEE Transactions on Energy Conversion
Integrating a battery energy storage system (BESS) with a large wind farm can smooth out the intermittent power from the wind farm. This paper focuses on development of a control strategy for optimal use of the BESS for this purpose. The paper considers a conventional feedback-based control scheme with revisions to incorporate the operating constraints of the BESS, such as state of charge limits, charge/discharge rate, and lifetime. The goal of the control is to have the BESS provide as much smoothing as possible so that the wind farm can be dispatched on an hourly basis based on the forecasted wind conditions. The effectiveness of this control strategy has been tested by using an actual wind farm data. Finally, it is shown that the control strategy is very important in determining the proper BESS size needed for this application.
11 March 2015 in IEEE Transactions on Industry Applications
Medium-voltage (MV) SiC devices have been developed recently which can be used for three-phase MV grid tie applications. Two such devices, 15 kV SiC insulated-gate bipolar transistor (IGBT) and 10 kV SiC MOSFET, have opened up the possibilities of looking into different converter topologies for the MV distribution grid interface. These can be used in MV drives, active filter applications, or as the active front end converter for solid-state transformers (SSTs). The transformerless intelligent power substation (TIPS) is one such application for these devices. TIPS is proposed as a three-phase SST interconnecting a 13.8 kV distribution grid with a 480 V utility grid. It is an all SiC device-based multistage SST. This paper focuses on the advantages, design considerations, and challenges associated with the operation of converters using these devices keeping TIPS as the topology of reference. The efficiency of the TIPS topology is also calculated using the experimentally measured loss data of the devices and the high-frequency transformer. Experimental results captured on a developed prototype of TIPS along with its measured efficiency are also given.
18 March 2010 in IEEE Transactions on Energy Conversion
Integrating a battery energy storage system (BESS) with a large wind farm can make a wind farm more dispatchable. This paper focuses on development of a control strategy for optimal use of the BESS for this purpose. The paper considers an open-loop optimal control scheme to incorporate the operating constraints of the BESS, such as state of charge limits, charge/discharge current limits, and lifetime. The goal of the control is to have the BESS to provide as much smoothing as possible, so that the wind farm can be dispatched on an hourly basis based on the forecasted wind conditions. The effectiveness of this control strategy has been tested by using an actual wind farm data. Furthermore, a real-time implementation strategy using model predictive control is also proposed. Finally, it is shown that the control strategy is very important in improving the BESS performance for this application.
1 January 1997 in IEEE Transactions on Industry Applications
This paper presents a new control scheme for a parallel hybrid active filter system intended for harmonic compensation of large nonlinear loads up to 50 MVA, to meet IEEE 519 recommended harmonic standards. The active filter is small rated, 2%-3% of load kilovoltampere rating. The control scheme is based on the concept of synthesizing a dynamically variable inductance, and its usefulness is demonstrated for an active filtering application. A synchronous reference frame (SRF) controller implements the dynamically varying negative or positive inductance by generating active filter inverter voltage commands. This variable inductance controller parallel hybrid active filter system can selectively synthesize multiple \"active inductances\" at dominant harmonic frequencies without affecting passive filter impedances at all other frequencies. This controller also provides a \"current limiting\" function to prevent passive filter overloading under ambient harmonic loads and/or supply voltage distortions. Three implementation variations of a parallel hybrid active filter system are presented. This paper also proposes the use of power factor correction capacitors as low cost passive filters for a parallel hybrid active filter system, which are controlled to provide either single or multiple tuned harmonic sinks and to increase cost effectiveness for high power applications. Simulation results validate the proposed variable inductance controller operation for mistuned passive filters.