Esteban Gil

Dr. Esteban Gil

orcid

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 April 2007 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
AQAna Quelhas
Ana Quelhas
EGEsteban Gil
Esteban Gil
JMJames D. McCalley
James D. McCalley
SRSarah M. Ryan
Sarah M. Ryan
This paper is the first of a two-part paper presenting a multiperiod generalized network flow model of the integrated energy system in the United States. Part I describes the modeling approach used to evaluate the economic efficiencies of the system-wide energy flows, from the coal and natural gas suppliers to the electric load centers. Under the proposed problem formulation, fuel supply and electricity demand nodes are connected via a transportation network, and the model is solved for the most efficient allocation of quantities and corresponding prices. The methodology includes physical, economic, and environmental aspects that characterize the different networks. Part II of this paper provides numerical results that demonstrate the application of the model

17 November 2003 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
EGEsteban Gil
Esteban Gil
JBJ. Bustos
J. Bustos
HRH. Rudnick
H. Rudnick
A new model to deal with the short-term generation scheduling problem for hydrothermal systems is proposed. Using genetic algorithms (GAs), the model handles simultaneously the subproblems of short-term hydrothermal coordination, unit commitment, and economic load dispatch. Considering a scheduling horizon period of a week, hourly generation schedules are obtained for each of both hydro and thermal units. Future cost curves of hydro generation, obtained from long and mid-term models, have been used to optimize the amount of hydro energy to be used during the week. In the genetic algorithm (GA) implementation, a new technique to represent candidate solutions is introduced, and a set of expert operators has been incorporated to improve the behavior of the algorithm. Results for a real system are presented and discussed.

28 February 2018 in Energies
Verified
Journal Article
Open access
PDF file
ELErick López
Erick López
CVCarlos Valle
Carlos Valle
HAHector Allende-Cid
Hector Allende-Cid
EGEsteban Gil
Esteban Gil
HMHenrik Madsen
Henrik Madsen
Wind power generation has presented an important development around the world. However, its integration into electrical systems presents numerous challenges due to the variable nature of the wind. Therefore, to maintain an economical and reliable electricity supply, it is necessary to accurately predict wind generation. The Wind Power Prediction Tool (WPPT) has been proposed to solve this task using the power curve associated with a wind farm. Recurrent Neural Networks (RNNs) model complex non-linear relationships without requiring explicit mathematical expressions that relate the variables involved. In particular, two types of RNN, Long Short-Term Memory (LSTM) and Echo State Network (ESN), have shown good results in time series forecasting. In this work, we present an LSTM+ESN architecture that combines the characteristics of both networks. An architecture similar to an ESN is proposed, but using LSTM blocks as units in the hidden layer. The training process of this network has two key stages: (i) the hidden layer is trained with a descending gradient method online using one epoch; (ii) the output layer is adjusted with a regularized regression. In particular, the case is proposed where Step (i) is used as a target for the input signal, in order to extract characteristics automatically as the autoencoder approach; and in the second stage (ii), a quantile regression is used in order to obtain a robust estimate of the expected target. The experimental results show that LSTM+ESN using the autoencoder and quantile regression outperforms the WPPT model in all global metrics used.

8 September 2014 in IEEE Transactions on Power Systems
Verified
Journal Article
Closed access
EGEsteban Gil
Esteban Gil
IAIgnacio Aravena
Ignacio Aravena
RCRaul Cardenas
Raul Cardenas
Generation capacity expansion planning (GCEP) is the process of deciding on a set of optimal new investments in generation capacity to adequately supply future loads, while satisfying technical and reliability constraints. This paper shows the application of stochastic mixed-integer programming (SMIP) to account for hydrological uncertainty in GCEP for the Chilean Central Interconnected System, using a two-stage SMIP multi-period model with investments and optimal power flow (OPF). The substantial computational challenges posed by GCEP imply compromising between the detail of the stochastic hydrological variables and the detail of the OPF. We selected a subset of hydrological scenarios to represent the historical hydro variability using moment-based scenario reduction techniques. The tradeoff between modeling accuracy and computational complexity was explored both regarding the simplification of the MIP problem and the differences in the variables of interest. Using a simplified OPF model, we found the difference of using a subset of hydro scenarios to be small when compared with using a full representation of the stochastic variable. Overall, SMIP with scenario reduction provided optimal capacity expansion plans whose investment plus expected operational costs were between 1.3% and 1.9% cheaper than using a deterministic approach and proved to be more robust to hydro variability.


1 January 2020 in Energy Economics
Verified
Journal Article
Closed access
DGDiego Godoy-González
Diego Godoy-González
EGEsteban Gil
Esteban Gil
GGGuillermo Gutierrez-Alcaraz
Guillermo Gutierrez-Alcaraz