Vincent Boyer

Dr. Vincent Boyer

orcid

Research Focus & Metrics

Academic Career Length

27Years (2000-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
8 April 2011 in Computers & Operations Research
Verified
Journal Article
Closed access
VBVincent Boyer
Vincent Boyer
DBDidier Jean-François El Baz
Didier Jean-François El Baz
MEM. Elkihel
M. Elkihel

1 December 2009 in European Journal of Operational Research
Verified
Journal Article
Closed access
VBVincent Boyer
Vincent Boyer
MEM. Elkihel
M. Elkihel
DBDidier Jean-François El Baz
Didier Jean-François El Baz

12 December 2017 in Journal of the Operational Research Society
Verified
Journal Article
Closed access
PDF file
RCRoberto Cantu-Funes
Roberto Cantu-Funes
MSM. Angélica Salazar-Aguilar
M. Angélica Salazar-Aguilar
VBVincent Boyer
Vincent Boyer
This paper introduces a variant of the well-known Multi-Depot Periodic Vehicle Routing Problem, which is inspired by a real situation of a distribution company. The problem consists in determining the number of extra vehicles to rent, the assignment of vehicles to plants, and the routes between plants and distribution centers, while the transportation cost is minimized. We propose a mixed integer linear formulation and a Reactive Greedy Randomized Adaptive Search Procedure to solve the problem. Extensive computational results show that the proposed procedure provides high-quality solutions with an average gap lower than 2.5% from the computed lower bound.

9 January 2018 in International Journal of Production Research
Verified
Journal Article
Closed access
JDJobish Vallikavungal Devassia
Jobish Vallikavungal Devassia
MSM. Angélica Salazar-Aguilar
M. Angélica Salazar-Aguilar
VBVincent Boyer
Vincent Boyer
In this work, we introduce a Flexible Job-shop Scheduling Problem with Resource Recovery Constraints (FRRC). In the FRRC, besides the constraints of the classical Flexible Job-shop Scheduling Problem (FJSP), operations may require resources to be processed. The resources are available in batches and a recovery time is required between each batch. This problem is inspired by a real situation faced by a brewing company where different yeasts are available in a limited quantity and are recovered only once they have been completely used. The objective is to schedule the operations such that the makespan is minimised. A mathematical model and a metaheuristic based on a General Variable Neighborhood Search is proposed for the solution of the FRRC. Computational results over a large set of instances, adapted from the FJSP literature, are presented.

12 June 2013 in Journal of Scheduling
Verified
Journal Article
Closed access
PDF file
VBVincent Boyer
Vincent Boyer
BGBernard Gendron
Bernard Gendron
LRLouis-Martin Rousseau
Louis-Martin Rousseau

16 February 2016 in The International Journal of Advanced Manufacturing Technology
Verified
Journal Article
Closed access
PDF file
SASáenz- Alanís
Sáenz- Alanís
CACésar A.
César A.
JDJobish Vallikavungal Devassia
Jobish Vallikavungal Devassia
MSM. Angélica Salazar-Aguilar
M. Angélica Salazar-Aguilar
VBVincent Boyer
Vincent Boyer