The joint optimisation of production scheduling and maintenance planning can significantly decrease production interruptions (or stoppages) and, simultaneously, improve production stability and enhance the reliability and availability of equipment and machines. This paper studies the joint optimisation of production schedules and CBM plans in a parallel-machine production setting. The machines are subject to deterioration, unexpected breakdowns, and deterioration-based failures. The reliability of the machines is modelled as a multi-state system in which two deterioration thresholds are introduced to initiate maintenance and prevent deterioration-based failures. An integrated optimisation model is proposed to solve this new problem. The proposed model employs Markov chains to formulate machines’ reliability and a matrix-based approach to estimate the expected processing times, energy consumption, and maintenance costs. Then, a mixed-integer programming model is proposed that jointly optimises production schedules and maintenance plans by minimising a weighted sum objective function that includes expected lateness, maintenance, and energy consumption costs. A genetic algorithm (GA) is used to solve the new problem, and extensive computational experiments are performed to test the performance of the proposed GA. The results show the superiority of the proposed GA for all the test problems compared to two well-known metaheuristics.
The practical applications of integrated maintenance policies and quality for a multi-component system are more complicated, still rare, and incomplete to meet the requirements of Industry 4.0. Therefore, this work aims to extend the integration economic model for optimizing maintenance policies and quality control parameters by incorporating the Taguchi loss function for a multi-component system. An optimization model is developed based on preventive maintenance, corrective maintenance policies, and quality control parameters with the CUSUM (Cumulative Sum) chart, which is widely used for detecting small shifts in the process mean. The model was developed to minimize the expected total cost per unit of time and to obtain the optimal values of decision variables: the size of samples, sample frequency, decision interval, coefficient of the CUSUM chart, and preventive and corrective maintenance intervals. The solution steps were employed by selecting a case study in the Alahlia Mineral Water Company (AMWC). Then, the design of experiments based on one-factor-at-a-time was used to evaluate the effect of selected decision variables on the expected total cost. Finally, sensitivity analysis was performed on the selected decision variables to demonstrate the robustness of the developed model. A predictive maintenance plan was developed based on the optimal value of preventive maintenance interval, and the results showed that the performance of the maintenance plan realizes the full potential of the integrated model. In addition, the case study results indicate that the extended integrated model for multicomponent is the new standard for the quality production of multi-component systems in future works.