Zilong Guo

Mr. Zilong Guo

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
14 May 2025 in Acta Geotechnica
Verified
Journal Article
Closed access
PDF file
ZWZhihui Wan
Zhihui Wan
QKQi Kai
Qi Kai
THTao Hu
Tao Hu
ZGZilong Guo
Zilong Guo
FZFeng Zhou
Feng Zhou
GDGuoliang Dai
Guoliang Dai

1 January 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
RZRun-ze Zhang
Run-ze Zhang
ZGZilong Guo
Zilong Guo
WGWeiming Gong
Weiming Gong
ZWZhihui Wan
Zhihui Wan
Utilizing the results of static load tests using the self-balancing method on two large-diameter bored piles from the Huaiyang Left Line Special Bridge Project of the Lianyungang–Zhenjiang Railway, this study aims to investigate the effect of combined tip-and-side post-grouting on the bearing characteristics of post-grouted piles in railway bridges. The difference in bearing performance between individual piles before and after grouting was evaluated using a comparative analysis. The results show that the bearing capacity of the pile foundations is greatly increased by combined tip-and-side post-grouting. In particular, following grouting, a single pile’s maximum bearing capacity rises from 32.99% to 38.42%. The combined post-grouting produces a compressed grout that enhances the mechanical characteristics of the pile–soil contact, resulting in a significant increase in side resistance all the way along the pile. The combined post-grouting also optimizes the performance of the tip resistance, resulting in a more rapid response as the pile tip displacement increases. Additionally, the combined post-grouting modifies the pile shaft’s load transfer mechanism by increasing the tip resistance’s contribution to the pile foundation’s ultimate bearing capacity and moving the bearing’s center of gravity closer to the pile end.


3 September 2025 in Journal of Rock Mechanics and Geotechnical Engineering
Verified
Journal Article
Open access
ZWZhihui Wan
Zhihui Wan
ZGZilong Guo
Zilong Guo
GDGuoliang Dai
Guoliang Dai
FZFeng Zhou
Feng Zhou

24 April 2026 in Soil Dynamics and Earthquake Engineering
Verified
Journal Article
Closed access
THTao Hu
Tao Hu
GDGuoliang Dai
Guoliang Dai
ZWZhihui Wan
Zhihui Wan
ZGZilong Guo
Zilong Guo
FZFan Zhang
Fan Zhang

1 August 2026 in International Journal of Geomechanics
Verified
Journal Article
Closed access
ZGZilong Guo
Zilong Guo
ZWZhihui Wan
Zhihui Wan
THTao Hu
Tao Hu
JJJiale Jin
Jiale Jin
FZFeng Zhou
Feng Zhou
GDGuoliang Dai
Guoliang Dai