Ilias Chouridis

Mr. Ilias Chouridis

orcid

Research Focus & Metrics

Academic Career Length

3Years (2024-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 March 2025 in Robotics
Verified
Journal Article
Open access
PDF file
ICIlias Chouridis
Ilias Chouridis
GMGabriel Mansour
Gabriel Mansour
VPVasileios Papageorgiou
Vasileios Papageorgiou
Michel Theodor MansourMichel Theodor Mansour
Michel Theodor Mansour
ATApostolos Tsagaris
Apostolos Tsagaris
Path planning is a vital challenge in robot navigation. In the real world, robots operate in 3D environments with various obstacles and restrictions. An improved artificial fish swarm algorithm (AFSA) is proposed to solve 3D path planning problems in environments with obstacles. The improved AFSA incorporates a 3D model of 24 possible movement points to more realistically simulate real-world robot movement capabilities. Several improvements are adopted, such as methods of simple and advanced 3D elimination. The 3D implementation of an agent’s navigation model, called an “obstacle heatmap”, is also presented. The use of a safety value factor and a total movement point factor in the AFSA’s objective function are introduced. The combination of improved AFSA and a ray-casting algorithm is also presented. Finally, a method called “multiple laser activation” is introduced to overcome both the main disadvantage of the application of AFSAs in path planning and the limitation of the finite number of possible movement points that appear when bio-inspired algorithms are applied to generate the optimal path in a grid environment. The resulting path is applied to real-world challenges with drones, coordinate measuring machines, and industrial robotic arms.

14 December 2024 in Robotics
Verified
Journal Article
Open access
PDF file
ICIlias Chouridis
Ilias Chouridis
GMGabriel Mansour
Gabriel Mansour
ATApostolos Tsagaris
Apostolos Tsagaris
Path planning is an intertemporal problem in the robotics industry. Over the years, several algorithms have been proposed to solve it, but weaknesses are constantly identified by researchers, especially in creating an optimal path in a three-dimensional (3D) environment with obstacles. In this paper, a method to reduce the lengths of optimal 3D paths and correct errors in path planning algorithms is proposed. Optimization is achieved by combining the information of a generated two-dimensional (2D) path with the input 3D path. The 2D path is created by a proposed improved artificial fish swarm algorithm (AFSA) that contains several improvements, such as replacing the random behavior of the fish with a proposed one incorporating the model of the 24 possible movement points and utilizing an introduced model to assist the agent’s navigation called obstacles heatmap. Moreover, a simplified ray casting algorithm is integrated with the improved AFSA to further reduce the length of the final path. The improved algorithm effectually managed to find the optimal path in complex environments and significantly reduce the length of the formed path compared with other state-of-the-art methods. The path was implemented in real-world scenarios of drone and industrial robotic arm applications.

15 July 2025 in Robotics
Verified
Journal Article
Open access
PDF file
ICIlias Chouridis
Ilias Chouridis
GMGabriel Mansour
Gabriel Mansour
ACAsterios Chouridis
Asterios Chouridis
VPVasileios Papageorgiou
Vasileios Papageorgiou
Michel Theodor MansourMichel Theodor Mansour
Michel Theodor Mansour
ATApostolos Tsagaris
Apostolos Tsagaris
Collaborative robots are vital in Industry 5.0 operations. They are utilized to perform tasks in collaboration with humans or other robots to increase overall production efficiency and execute complex tasks. Aiming at a comprehensive approach to assembly processes and highlighting new applications of collaborative robots, this paper presents the development of a digital twin (DT) for the design, monitoring, optimization and simulation of robots’ deployment in assembly cells. The DT integrates information from both the physical and virtual worlds to design the trajectory of collaborative robots. The physical information about the industrial environment is replicated within the DT in a computationally efficient way that aligns with the requirements of the path planning algorithm and the DT’s objectives. An enhanced artificial fish swarm algorithm (AFSA) is utilized for the 4D path planning optimization, taking into account dynamic and static obstacles. Finally, the proposed framework is utilized for the examination of a case in which four industrial robotic arms are collaborating for the assembly of an industrial component.

17 August 2025 in Machines
Verified
Journal Article
Open access
PDF file
VPVasileios Papageorgiou
Vasileios Papageorgiou
GMGabriel Mansour
Gabriel Mansour
ICIlias Chouridis
Ilias Chouridis
Additive Manufacturing is a rapidly developing technology that enables the fabrication of objects with complex geometries and high levels of customization while keeping the prototyping costs relatively low. In recent years, its application has grown to include the fabrication of end-use parts, creating new opportunities in industries such as the automotive, aerospace, mechanical, and hydraulic engineering industries. The present research paper focuses on the fabrication and evaluation of 3D-printed operational end-use parts of a water pump, which were originally made from cast iron. This approach aims to determine whether AM can be an alternative for metal parts in operational systems such as water pumps. In particular, the impeller of a centrifugal pump is remanufactured using material extrusion AM technology with PPS-CF composite polymer as a fabrication material. Subsequently, the surface roughness of the two parts is measured, and the performance of each part is predicted by creating a CFD model. Additionally, the printed part is compared to the original part by conducting a centrifugal pump performance test for each impeller. The results show that the 3D-printed impeller achieves an approximate 15% increase in overall efficiency compared to the original impeller.

11 April 2025 in Robotics
Verified
Journal Article
Open access
PDF file
ICIlias Chouridis
Ilias Chouridis
GMGabriel Mansour
Gabriel Mansour
VPVasileios Papageorgiou
Vasileios Papageorgiou
Michel Theodor MansourMichel Theodor Mansour
Michel Theodor Mansour
ATApostolos Tsagaris
Apostolos Tsagaris
Industry 5.0 is a developing phase in the evolution of industrialization that aims to reshape the production process by enhancing human creativity through the utilization of automation technologies and machine intelligence. Its central pillar is the collaboration between robots and humans. Path planning is a major challenge in robotics. An offline 4D path planning algorithm is proposed to find the optimal path in an environment with static and dynamic obstacles. The time variable was embodied in an enhanced artificial fish swarm algorithm (AFSA). The proposed methodology considers changes in robot speeds as well as the times at which they occur. This is in order to realistically simulate the conditions that prevail during cooperation between robots and humans in the Industry 5.0 environment. A method for calculating time, including changes in robot speed during path formation, is presented. The safety value of dynamic obstacles, the coefficients of the importance of the terms of the agent’s distance to the ending point, and the safety value of dynamic obstacles were introduced in the objective function. The coefficients of obstacle variation and speed variation are also proposed. The proposed methodology is applied to simulated real-world challenges in Industry 5.0 using an industrial robotic arm.

29 October 2025 in Metrology
Verified
Journal Article
Open access
PDF file
ICIlias Chouridis
Ilias Chouridis
GMGabriel Mansour
Gabriel Mansour
VPVasileios Papageorgiou
Vasileios Papageorgiou
Michel Theodor MansourMichel Theodor Mansour
Michel Theodor Mansour
ATApostolos Tsagaris
Apostolos Tsagaris
Conducting measurements is a daily and time-consuming process that is critical to the manufacturing industry. The most widespread way to carry out the measuring process is using a Coordinate Measuring Machine (CMM). In this paper, a methodology is presented to accelerate the measuring procedure by optimally programming a CMM. The proposed methodology utilizes the information from a computer-aided design (CAD) file and the capabilities of CMMs in order to optimize the measurement process. An improved artificial fish swarm algorithm was modified to meet the requirements of the measurement process and the capabilities of the CMMs. In addition, the ant colony optimization method is applied to extract the optimal sequence of measurements throughout the multiple areas on the component. The resulting optimal path also utilizes the free areas between the different manufactured features of the component. Finally, the resulting path is collision-free, ensuring the integrity and the safety of the CMM. The proposed methodology is verified through real-world experiments.