Izabela Dziaduch

Dr. Izabela Dziaduch

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
13 May 2023 in Ekonomia i Środowisko - Economics and Environment
Verified
Journal Article
Open access
PDF file
IDIzabela Dziaduch
Izabela Dziaduch
The purpose of this paper was to assess the level of satisfaction of passengers using public transport services in Wrocław and to identify the quality characteristics that the service provider needs to improve if it wants to increase the overall quality of its services. The passenger satisfaction survey was conducted according to the stages of the developed procedure outlined in the article. In pursuit of the stated goal, CSI and IPA were used. The main measurement tool used was a survey questionnaire. The survey was conducted on a sample of 500 respondents, which allows us to trust the results at 95%, assuming an “estimation error” of ± 5%. A total of 14 transport demands were selected to evaluate the level of satisfaction of passengers using services provided by MPK Wrocław. Statistical analysis of the data was carried out using Statistica 13.3 software and using functions and commands available in Microsoft Excel. The results obtained allowed us to conduct a detailed analysis related to the level of the services quality of the Wrocław’s public transport. These results should be used by urban transport organisers and operators to shape their transport offerings, primarily in terms of increasing the quality of transport services. This is very important since it is, among other things, the quality of public mass transport that determines the quality of life of residents, as well as the conditions for economic development of the transport network.

20 December 2024 in Sustainability
Verified
Journal Article
Open access
PDF file
IDIzabela Dziaduch
Izabela Dziaduch
PPPiotr Peternek
Piotr Peternek
Wrocław is the most congestion-challenged city in Poland. Improving the appeal of public transport over private car use could be an effective remedy for the city’s notorious congestion problems. This article evaluates public transport service quality in Wrocław from the passengers’ perspective. The quality assessment focused on two key areas: the quality of service that passengers expect (preference evaluation) and the quality they perceive are delivered by the transport organiser and operator (satisfaction evaluation). Both passenger preferences and satisfaction were assessed based on 14 selected transport service attributes, referred to as quality attributes. To carry out this analysis, the Analytic Hierarchy Process (AHP) method and the SUTI Indicator 4 (Public Transport Quality and Reliability), which is part of the Sustainable Urban Transport Index (SUTI), were employed. Data were collected via a survey questionnaire with a sample of 500 bus and tram users in the city. Statistical analysis of the data were performed using functions and commands available in Microsoft Excel. The resulting SUTI Indicator 4 values (42.6% for bus services and 45.9% for tram services) suggest that Wrocław residents are moderately satisfied with the current public transport system. The study reveals that the transport organiser and operator should prioritise attributes related to travel time, as their fulfilment levels are shown to be either low or moderate. Therefore, in order to encourage more car users to switch to public transport in Wrocław, emphasis should be placed on solutions that ensure punctual departures and provide passengers with greater confidence in reaching their destinations on time.

10 November 2021 in Ekonomia i Środowisko - Economics and Environment
Verified
Journal Article
Open access
PDF file
IDIzabela Dziaduch
Izabela Dziaduch
The article presents an economic analysis of the life cycle of rail buses. As this analysis part, the costs incurred by the user in the exploitation phase of a rail bus were assessed. The cost estimate was based on the author’s own method of forecasting the exploitation costs of a technical object (e.g. means of transport, equipment, machinery), which takes into account the variability of the costs incurred over time. The article also provides the implementation of the aforementioned method, verifying its practical application when estimating the exploitation costs of technical objects. Experimental verification aimed at assessing the usability of the cost forecasting method is the purpose of this article. The verification was carried out for eight single mode X type rail buses produced by the same manufacturer. The experimental verification of the method used to estimate exploitation costs in the life cycle of objects consisted in: 1. Conducting reliability analysis of the exploitation objects in order to obtain data of technical and economic nature; 2. Entering data into the method and calculating cost forecasts; 3. Assessing correctness of the results. The degree of accuracy of the exploitation cost forecast was measured using ex post relative forecast error. The compatibility analysis of the forecast cost values with the actual ones showed their high compatibility, as evidenced by the level of the estimated relative errors (the average error was 4.9%). Therefore, it can be concluded that the prognostic value of the method is relatively high. W artykule przedstawiono ekonomiczną analizę cyklu życia autobusów szynowych. W ramach tej analizy ocenie poddano koszty ponoszone przez użytkownika w fazie eksploatacji autobusu szynowego. Do oszacowania kosztów wykorzystano autorską metodę prognozowania kosztów eksploatacji obiektu technicznego (np. środka transportu, urządzenia, maszyny), która uwzględnia zmienność ponoszonych kosztów w czasie. W artykule przeprowadzono także implementację tej metody weryfikującej możliwość jej zastosowania w praktyce przy szacowaniu kosztów eksploatacji obiektów technicznych. Weryfikacja doświadczalna, która oceni przydatność metody prognozowania kosztów jest celem niniejszego artykułu. Weryfikację przeprowadzono dla ośmiu jednoczłonowych autobusów szynowych typu X wyprodukowanych przez tego samego producenta. Weryfikacja doświadczalna metody szacowania kosztów eksploatacji w cyklu życia obiektów polegała na: Przeprowadzeniu badań niezawodności obiektów eksploatacji w celu uzyskania danych o charakterze techniczno-ekonomicznym, Wstawieniu danych do metody i obliczeniu prognoz kosztów; Ocenie poprawności wyników. Stopień trafności prognozy kosztów eksploatacji zmierzono za pomocą względnego błędu prognozy ex post. Analiza zgodności prognozowanych wartości kosztów z rzeczywistymi, wykazała dużą ich zgodność, o czym świadczy poziom oszacowanych błędów względnych (średni błąd wyniósł 4,9%). Uznać zatem można, że wartość prognostyczna metody jest stosunkowo wysoka. Zaprezentowana w artykule ekonomiczna analiza cyklu życia obiektów technicznych jest jednym z narzędzi do oceny stopnia wdrożenia zasad zrównoważonego rozwoju w transporcie. Ocena stosowania filozofii zrównoważonego rozwoju w praktyce opiera się jednak nie tylko na wiedzy, jakiej dostarcza ekonomiczna analiza cyklu życia, ale także na wiedzy z zakresu środowiskowej i społecznej oceny cyklu życia obiektu. Dlatego też, analiza cyklu życia autobusów szynowych biorąca pod uwagę aspekty środowiskowe i społeczne stanowi kolejny etap pracy badawczej autorki niniejszego artykułu.

1 December 2020 in Engineering Management in Production and Services
Verified
Journal Article
Open access
IDIzabela Dziaduch
Izabela Dziaduch
The purpose of the article is to present the method for forecasting one of the three categories of exploitation costs, i.e., operational costs. The article analyses the available subject literature discussing the methods of measuring operational costs used in the LCC analysis. The presented method for forecasting operational costs of technical objects applies econometric modelling, probability distributions and certain elements of descriptive and mathematical statistics. The statistical data analysis was performed using the functions and commands available in Microsoft Excel. Weibull++ application was also used for constructing probability distributions for random variables and verifying hypotheses. The method was tested on eight single-mode railbuses, operated by one of the regional railway companies providing passenger transport. An ex-post relative forecast error was used to measure the level of accuracy of the operational cost forecast. The analysis of the compliance between forecasted cost value and the actual costs showed extensive convergence as evidenced by the level of estimated relative errors. In forecasting the operational costs of railbuses, the average error was approx. 2.9%. The presented method can, therefore, constitute the basis for the estimation of both operational costs and exploitation costs, which represent an important cost component considered when assessing the profitability of purchasing one of the several competing technical objects offered by the industry.