Danny Murguia

Dr. Danny Murguia

orcid

Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2021 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
DMDanny Murguia
Danny Murguia
PDPeter Demian
Peter Demian
RSRobby Soetanto
Robby Soetanto
Systemic innovations require multiple interdependent actors to change their practices simultaneously in order to realize the benefits of the innovation. Building information modeling (BIM) has been classified as a systemic innovation that is adopted by building projects, firms, and users. However, the slow diffusion of BIM in the architecture, engineering, and construction (AEC) sector has maintained the gap between BIM visions and actual BIM practice. Some governments are planning to enact policies to promote BIM adoption in construction. However, in some countries, BIM adoption has already started with large construction organizations (i.e., the middle-out diffusion approach). To learn from previous experience and before enacting top-down interventions, policymakers require a model to stimulate systemic BIM adoption for entire supply chains with fragmented project and organizational structures. The current paper investigates the systemic adoption of digital innovations in construction and is aimed at formulating a model of systemic BIM adoption (MSBA). Three primary datasets consisting of 133 BIM users, 30 chief executive officers, and 20 project managers were collected in Peru and collectively analyzed using cross-classified multilevel modeling (CCMM). It was found that MSBA has five user-, three firm-, and two project-level factors, explaining 28%, 75%, and 50% of the variance in users’ BIM adoption, respectively. The proposed model would provide useful guidance for corporate decision makers and government policymakers to develop BIM-diffusion policies to accelerate adoption. It would also provide a useful practical implementation framework as the industry progresses toward a digital mode of working and could underpin further digitalization of the sector worldwide.

1 January 2023 in Journal of Construction Engineering and Management
Verified
Journal Article
Closed access
PDF file
DMDanny Murguia
Danny Murguia
CVCristhian Vasquez
Cristhian Vasquez
PDPeter Demian
Peter Demian
Robby SoetantoRobby Soetanto
Robby Soetanto
Building information modeling (BIM) adoption in construction remains a challenge, yet no empirical studies were conducted to gauge adoption behavior changes over time. Such a longitudinal study of BIM adoption would be particularly significant at this pivotal point in the history of construction, as it undergoes a worldwide digital transformation. In some contexts, BIM adoption has been led by contractors without policy intervention; thus, contractors’ adoption behaviors must be understood before policymakers enact top-down interventions for public construction in entire supply chains. Two cross-sectional data sets were collected in 2017 (N=303 ) and 2020 (N=171 ) in Lima, Peru, to evaluate changes in a modified technology adoption model (TAM) regarding BIM adoption. Confirmatory factor analysis (CFA), structural equation modeling (SEM), and ANOVA were used to analyze the data. This study shows that contractors adopt BIM if they believe that BIM helps to improve project performance, rather than their own individual performance. Similarly, contractors are concerned with the easiness of implementing BIM in firms and projects rather than the ease of learning BIM. Overall, perceived usefulness to project, perceived ease of implementation, and intention to use BIM had a significant change between 2017 and 2020. Although BIM implementation increased from 25% to 39% at the project level, the adoption at the user level has not significantly changed. This finding suggests that contractors value supply chain/project level implementation benefits rather than successful individual adoption. The results also show that contractors rely on in-house BIM teams or outsourced consultants to carry out BIM-related tasks. However, this would depict a within-firm digital divide between BIM teams and site management. The results are discussed in the context of national change as a BIM policy for public construction was announced by the Peruvian government in 2019. The findings of this research may be used by decision makers to target specific groups of professionals on educational programs. Policymakers could use the findings to inform roadmaps for BIM adoption in Peru and similar countries.

6 December 2021 in Engineering, Construction and Architectural Management
Verified
Journal Article
Closed access
DMDanny Murguia
Danny Murguia
PDPeter Demian
Peter Demian
RSRobby Soetanto
Robby Soetanto
Purpose: The current understanding of building information modelling (BIM) adoption often neglects the industry context in which BIM is deployed. This is particularly problematic when policymakers are planning to enact top-down policies to promote BIM adoption in public-funded construction. Therefore, the aim of this study is to establish the industry-level factors that constraint or enable actors' intention to adopt BIM.Design/methodology/approach: Using institutional theory with an emphasis on the cultural-cognitive elements, the authors aim to complement the understanding of BIM adoption by incorporating institutional elements into the unified theory of acceptance and use of technology (UTAUT). The cultural-cognitive elements were extracted from focus groups and interviews with architecture, construction and engineering (AEC) professionals in Peru. A modified UTAUT was empirically tested using confirmatory factor analysis (CFA) and structural equation modelling (SEM) with a dataset from 171 questionnaire responses.Findings: The industry characteristics, standardisation, affordability and technology/methodology definition of BIM were found to be the cultural-cognitive elements having direct effects on individual reactions to BIM. These findings suggest that BIM adoption policies should focus on designing incentives schemes, training/educating professionals on BIM collaborative processes and developing/adapting applicable standards. However, a BIM adoption mandate would require policymakers to create collaborative procurement environments in tandem with information management and process standards.Practical implications: Findings can be used by policymakers to significantly promote BIM adoption in contexts without a government mandate for public sector construction.Originality/value: The study of institutional elements on BIM adoption is still limited. This study provides empirical evidence on how the cultural-cognitive elements of the industry context are associated with actors' intention to adopt BIM. Therefore, this study bridges industry and individual levels of analysis. Furthermore, this study enables policymakers to initiate actions that significantly encourage BIM adoption.

1 January 2017 in Procedia Engineering
Verified
Journal Article
Open access
XBXavier Brioso
Xavier Brioso
DMDanny Murguia
Danny Murguia
AUAlonso Urbina
Alonso Urbina

1 June 2018 in Alexandria Engineering Journal
Verified
Journal Article
Open access
XBXavier Brioso
Xavier Brioso
AHAntonio Humero
Antonio Humero
DMDanny Murguia
Danny Murguia
JCJaclyn Corrales
Jaclyn Corrales
JAJohana Aranda
Johana Aranda

20 December 2017 in Organization, Technology and Management in Construction: an International Journal
Verified
Journal Article
Open access
PDF file
XBXavier Brioso
Xavier Brioso
DMDanny Murguia
Danny Murguia
AUAlonso Urbina
Alonso Urbina
This article presents strategies for teaching scheduling methods such as takt-time, flowlines, and point-to-point precedence relations (PTPPRs) using building information modeling (BIM) models in the Last Planner System. This article is the extended version of the article entitled “TeachingTakt-Time, Flowline and Point-to-point Precedence Relations: A Peruvian Case Study,” which has been published inProcedia Engineering(Vol. 196, 2017, pages 666–673). A case study is conducted in final year students of civil engineering at the Pontifical Catholic University of Peru. The mock-up project is an educational building that has high repetitive processes in the structural works phase. First, traditional tools such as Excel spreadsheets and 2D drawings were used to teach production system design with takt-time, flowlines, and PTPPR. Second, 3D and 4D models with Revit 2016 and Navisworks 2016 were used to integrate the previous schedules with a BIM model and to identify its strengths and weaknesses. Finally, Vico Office was used for the automation of schedules and comparison of the methods in 4D and 5D. This article describes the lectures, workshops, and simulations employed, as well as the feedback from students and researchers. The success of the teaching strategy is reflected in the survey responses from students and the final perceptions of the construction management tools presented.