Eenjun Hwang

Prof. Eenjun Hwang

School of Electrical Engineering, Korea University, 145 Anam-ro, Seongbuk-gu, Seoul 02841, Korea
orcid

Research Focus & Metrics

Academic Career Length

24Years (2003-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
10 October 2019 in Applied Sciences
Verified
Journal Article
Open access
PDF file
Tuong LeTuong Le
Tuong Le
MVMinh Thanh Vo
Minh Thanh Vo
BVBay Vo
Bay Vo
Eenjun HwangEenjun Hwang
Eenjun Hwang
SRSeungmin Rho
Seungmin Rho
Sung Wook BaikSung Wook Baik
Sung Wook Baik
The electric energy consumption prediction (EECP) is an essential and complex task in intelligent power management system. EECP plays a significant role in drawing up a national energy development policy. Therefore, this study proposes an Electric Energy Consumption Prediction model utilizing the combination of Convolutional Neural Network (CNN) and Bi-directional Long Short-Term Memory (Bi-LSTM) that is named EECP-CBL model to predict electric energy consumption. In this framework, two CNNs in the first module extract the important information from several variables in the individual household electric power consumption (IHEPC) dataset. Then, Bi-LSTM module with two Bi-LSTM layers uses the above information as well as the trends of time series in two directions including the forward and backward states to make predictions. The obtained values in the Bi-LSTM module will be passed to the last module that consists of two fully connected layers for finally predicting the electric energy consumption in the future. The experiments were conducted to compare the prediction performances of the proposed model and the state-of-the-art models for the IHEPC dataset with several variants. The experimental results indicate that EECP-CBL framework outperforms the state-of-the-art approaches in terms of several performance metrics for electric energy consumption prediction on several variations of IHEPC dataset in real-time, short-term, medium-term and long-term timespans.

25 November 2018 in Energies
Verified
Journal Article
Open access
PDF file
Jihoon MoonJihoon Moon
Jihoon Moon
YKYongsung Kim
Yongsung Kim
MSMinjae Son
Minjae Son
Eenjun HwangEenjun Hwang
Eenjun Hwang
A stable power supply is very important in the management of power infrastructure. One of the critical tasks in accomplishing this is to predict power consumption accurately, which usually requires considering diverse factors, including environmental, social, and spatial-temporal factors. Depending on the prediction scope, building type can also be an important factor since the same types of buildings show similar power consumption patterns. A university campus usually consists of several building types, including a laboratory, administrative office, lecture room, and dormitory. Depending on the temporal and external conditions, they tend to show a wide variation in the electrical load pattern. This paper proposes a hybrid short-term load forecast model for an educational building complex by using random forest and multilayer perceptron. To construct this model, we collect electrical load data of six years from a university campus and split them into training, validation, and test sets. For the training set, we classify the data using a decision tree with input parameters including date, day of the week, holiday, and academic year. In addition, we consider various configurations for random forest and multilayer perceptron and evaluate their prediction performance using the validation set to determine the optimal configuration. Then, we construct a hybrid short-term load forecast model by combining the two models and predict the daily electrical load for the test set. Through various experiments, we show that our hybrid forecast model performs better than other popular single forecast models.

26 February 2021 in Sensors
Verified
Journal Article
Open access
PDF file
SJSeungmin Jung
Seungmin Jung
Jihoon MoonJihoon Moon
Jihoon Moon
SPSungwoo Park
Sungwoo Park
Eenjun HwangEenjun Hwang
Eenjun Hwang
Recently, multistep-ahead prediction has attracted much attention in electric load forecasting because it can deal with sudden changes in power consumption caused by various events such as fire and heat wave for a day from the present time. On the other hand, recurrent neural networks (RNNs), including long short-term memory and gated recurrent unit (GRU) networks, can reflect the previous point well to predict the current point. Due to this property, they have been widely used for multistep-ahead prediction. The GRU model is simple and easy to implement; however, its prediction performance is limited because it considers all input variables equally. In this paper, we propose a short-term load forecasting model using an attention based GRU to focus more on the crucial variables and demonstrate that this can achieve significant performance improvements, especially when the input sequence of RNN is long. Through extensive experiments, we show that the proposed model outperforms other recent multistep-ahead prediction models in the building-level power consumption forecasting.

5 August 2009 in Multimedia Tools and Applications
Verified
Journal Article
Closed access
PDF file
BHByeong-Jun Han
Byeong-Jun Han
SRSeungmin Rho
Seungmin Rho
SJSanghoon Jun
Sanghoon Jun
Eenjun HwangEenjun Hwang
Eenjun Hwang

28 September 2019 in International Journal of Distributed Sensor Networks
Verified
Journal Article
Open access
PDF file
JMJihoon Moon
Jihoon Moon
SPSungwoo Park
Sungwoo Park
SRSeungmin Rho
Seungmin Rho
Eenjun HwangEenjun Hwang
Eenjun Hwang
Smart grids have recently attracted increasing attention because of their reliability, flexibility, sustainability, and efficiency. A typical smart grid consists of diverse components such as smart meters, energy management systems, energy storage systems, and renewable energy resources. In particular, to make an effective energy management strategy for the energy management system, accurate load forecasting is necessary. Recently, artificial neural network–based load forecasting models with good performance have been proposed. For accurate load forecasting, it is critical to determine effective hyperparameters of neural networks, which is a complex and time-consuming task. Among these parameters, the type of activation function and the number of hidden layers are critical in the performance of neural networks. In this study, we construct diverse artificial neural network–based building electric energy consumption forecasting models using different combinations of the two hyperparameters and compare their performance. Experimental results indicate that neural networks with scaled exponential linear units and five hidden layers exhibit better performance, on average than other forecasting models.

10 November 2020 in IEEE Access
Verified
Journal Article
Open access
JMJaeuk Moon
Jaeuk Moon
SJSeungwon Jung
Seungwon Jung
SPSungwoo Park
Sungwoo Park
Eenjun HwangEenjun Hwang
Eenjun Hwang
Load forecasting is one of the critical tasks for enhancing the energy efficiency of smart grids. Even though recent deep learning-based load forecasting models have shown excellent forecasting performance, one of the common problems they faced was that their forecasting accuracy was highly dependent on the data quality and quantity available for the model training. Collecting a sufficient amount of high-quality data is expensive and time-consuming. Recently, a generative adversarial network (GAN) has shown its potential as a solution to the data shortage problem by generating virtual data based on a small amount of real data, and several studies have used GAN to generate electric load data for training forecasting models. However, due to the noise data problem of GANs, their predictive performance also deteriorated. To solve this problem, in this study, we propose a two-stage data generation scheme that more effectively generates input and output variables for short-term load forecasting. In the first stage, we generate virtual calendar and temperature data used as input variables using a conditional tabular GAN (CTGAN). In the second stage, we generate electric load data corresponding to the input variables using a deep learning-based regression model. Lastly, we construct our forecasting model by training another regression model using a mixture of generated data and real data. To verify the effectiveness of our scheme, we conducted extensive experiments using various datasets and data generation models. We report some of the results.