In a construction project, the cost and duration of activities could change due to different uncertain variables such as weather, resource availability, etc. Resource leveling and allocation strategies also influence total time and costs of projects. In this paper, two concepts of time-cost trade-off and resource leveling and allocation have been embedded in a stochastic multiobjective optimization model which minimizes the total project time, cost, and resource moments. In the proposed time-cost-resource utilization optimization (TCRO) model, time and cost variables are considered to be fuzzy, to increase the flexibility for decision makers when using the model outputs. Application of fuzzy set theory in this study helps managers/planners to take these uncertainties into account and provide an optimal balance of time, cost, and resource utilization during the project execution. The fuzzy variables are discretized to represent different options for each activity. Nondominated sorting genetic algorithm (NS...
1 October 2004 in Journal of Irrigation and Drainage Engineering
The Tehran metropolitan area is one of the mega cities of the world and has an annual domestic water consumption close to one billion cubic meters. The sewer system mainly consists of traditional absorption wells. Therefore, the return flow from the domestic consumption has been one of the main sources of groundwater recharge. Some part of this sewage is drained into local rivers and drainage channels and partially contaminates the surface runoff and local flows. These polluted surface waters are used in conjunction with groundwater for irrigation purposes in the southern part of the Tehran. In this paper, a systematic approach to surface and groundwater resources modeling in the study area, with its complex system of water supply, groundwater recharge, and discharge, is discussed. A dynamic programming optimization model is developed for conjunctive use planning. The objective function of this model is developed to supply the agricultural water demands, to reduce pumping costs, and to control groundwater...
21 July 2012 in Stochastic Environmental Research and Risk Assessment