The purpose of this study is to solve the problem of low load factor and profit margin in the point-to-point transportation of international freight trains through the assembly transportation organization mode. A bi-objective location-routing optimization model is constructed to optimize problems, such as the location of the assembly center, route of freight assembly, frequency of international freight trains, and number of formations. The objectives are to minimize the total comprehensive cost and maximize the average satisfaction of the shippers. Considering the impact of blockchain technology, the proportion of customs clearance time reduction after blockchain implementation, the proportion of customs clearance fee reduction after blockchain implementation, and the cost of blockchain technology are introduced into the model. The case study is based on railroad transportation data for 2022. In this case, 43 stations in the Indo-China Peninsula are selected as origin stations, and two Chinese stations are designated terminal stations. An improved NSGA-II algorithm (ANSGAII-OD) is proposed to resolve the location-routing optimization model. This algorithm is based on opposition-based learning and its dominant strength. The case study indicates that assembly transportation is advantageous compared with direct transportation. Moreover, the comprehensive cost is reduced by 19.77%. Furthermore, blockchain technology can effectively reduce costs and improve transportation efficiency. After the implementation of blockchain technology, the comprehensive cost is reduced by 8.10%, whereas the average satisfaction of shippers is increased by 10.35%.
As an efficient management pattern to improve logistics efficiency through intensive management of construction materials, construction logistics centers (CLCs) have received active attention from academics and practitioners. However, the CLC location–allocation problem, which considers periodic demand and transportation risk, has not been adequately solved. This work provides an approach to integrating transportation path risk into multiperiod CLC location–allocation optimization for large-scale projects in complex environmental regions. For this purpose, this paper formulates a hybrid non-linear integer planning model to define this location–allocation problem and minimize the total cost of construction logistics and transportation risk. The model also incorporates critical features from realistic scenarios, including CLC’s service coverage, capacity constraints, and minimum utilization limits. We have designed an NSGA-II based on endocrine hormone regulation (EHR-NSGA-II) to solve the model. Finally, a large-scale railroad construction project in complex environmental regions is used as an example to prove the effectiveness of the model and algorithm. Compared with the single-period model, the multiperiod model designed in this paper provides a total cost reduction of 8.11% for the CLC location–allocation scheme. In addition, analyzing several key parameters provides valuable insights for managers to design more reliable construction logistics networks.