As a weak part of the concrete tower in wind turbines, the insufficient shear capacity of vertical joints can cause the local shear failure of the tower, reduce the overall bearing capacity and stability of the tower, and lead to safety issues. At present, the splicing of tower vertical joints mainly uses epoxy resin filling and arc bolt connections. However, sometimes the concrete near the vertical joints is damaged due to compression after applying pretension to the arc bolts, which will affect the bearing capacity and stability of the entire tower structure. If other interface processes are used for vertical joint splicing, the shear performance will be directly affected. Therefore, in order to study the influence of different interface processes on the shear performance of vertical joints in concrete tower tubes, four vertical joint specimens were designed for a pull-out test under shear load and the failure mode of the specimens and the shear capacity of the vertical joint interface were analyzed and studied. The results showed that with an increase in epoxy thickness and the application of an interface chiseling treatment, as well as injecting epoxy resin into the channels, the shear performance of vertical joints could be enhanced. Finally, based on existing research and standardized design methods, the shear capacity of vertical joints in wind turbine concrete towers was predicted, which showed that the existing design methods were not yet fully applicable to the shear capacity design of vertical joints in wind turbine concrete towers with different interface processes. Further research is needed to supplement and improve them.

5 August 2026 in Buildings
Verified
Journal Article
Open access
PDF file
YLYanlai Liang
Yanlai Liang
YZYunhui Zhang
Yunhui Zhang
JTJike Tan
Jike Tan
To investigate the pull-out behavior of semi-embedded anchor bolts in the concrete transition sections of steel–concrete hybrid wind turbine towers, five 1:2-scale local specimens were tested under monotonic pull-out loading. The effects of reinforcement, end-plate size, number of anchor bolts, and sleeve installation on the failure mode, load–cumulative surface crack-opening displacement response, reinforcement strain, and ultimate pull-out capacity were analyzed. The results show that reinforcement significantly improved both the pull-out resistance and the apparent deformation capacity characterized by cumulative surface crack opening, changing the failure mode from brittle cracking of plain concrete to a ductile combined mechanism governed by end-plate bearing, concrete splitting, reinforcement restraint, and boundary effects. Increasing the end-plate size, changing the anchor arrangement, and installing a sleeve produced only indicative trends in this limited test series because only one specimen was tested for each configuration. Existing methods were also evaluated as benchmark approaches. The characteristic resistance predicted by EN 1992-4 was conservative, partly because of its fractile basis and partly because the tested configuration was outside the assumptions of an unconstrained concrete cone breakout model. The 45° cone method underestimated the capacity of the reinforced specimens but slightly overestimated that of the plain-concrete specimen, whereas the Nilforoush and LEFM methods overestimated the capacity. These findings provide initial experimental evidence for understanding the load-transfer and failure mechanisms of semi-embedded anchor bolts and clarify the applicability and limitations of the existing calculation methods. The development of a reliable predictive model requires a broader experimental database and systematic numerical investigations.

1 May 2025
Verified
Conference Paper
Open access
PDF file
CLCsic Haizhuang Wind Power Co. Ltd
Csic Haizhuang Wind Power Co. Ltd
YZYang Zhou
Yang Zhou
CLChina State Shipbuilding Windpower Development Co. Ltd
China State Shipbuilding Windpower Development Co. Ltd
EHErtong Hao
Ertong Hao
HCHai Cao
Hai Cao
JTJike Tan
Jike Tan
The adapter ring connects the upper steel tower section and the lower concrete tower section in the steel-concrete hybrid structure tower of the wind turbine unit. Whether its bearing capacity meets the standard will directly affect the stability and safety of the entire wind turbine tower. Therefore, this article will take the actual engineering of a 160 m steel-concrete hybrid structure tower as the background, and evaluate the safety of the adapter ring by monitoring its strain data of key points after tensioning and pre-stressing in order to ensure the smooth progress of subsequent working conditions.