Anna Zagórska

Anna Zagórska

orcid

Research Focus & Metrics

Academic Career Length

8Years (2019-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
21 April 2020 in Energies
Verified
Journal Article
Open access
PDF file
Krzysztof SkrzypkowskiKrzysztof Skrzypkowski
Krzysztof Skrzypkowski
WKWaldemar Bolesław Korzeniowski
Waldemar Bolesław Korzeniowski
KZKrzysztof Zagórski
Krzysztof Zagórski
AZAnna Zagórska
Anna Zagórska
The article presents a novel yielding mechanism, especially designed for the rock bolt support. Mechanical rock bolts with an expansion head and equipped with one, two, four and six dome bearing plates were tested in the laboratory conditions. Furthermore, in the Phase2D numerical program, five room and pillar widths were modeled. The main aim of numerical modeling was to determine the maximal range of the rock damage area and the total displacements in the expanded room. The models were made for a room and pillar method with a roof sag for copper ore deposits in the Legnica-Głogów Copper District in Poland. Additionally, in the article a load model of the rock bolt support as a result of a geomechanical seismic event is presented. Based on the results of laboratory tests (load–displacement characteristics), the strain energy of the bolt support equipped with the yielding device in the form of dome bearing plates was determined and compared with the impact energy caused by predicted falling rock layers. Based on the laboratory tests, numerical modeling and mathematical dynamic model of rock bolt support, the dependence of the drop height and the corresponding impact energy for the expanded room was determined.

11 April 2020 in Energies
Verified
Journal Article
Open access
PDF file
Krzysztof SkrzypkowskiKrzysztof Skrzypkowski
Krzysztof Skrzypkowski
WKWaldemar Bolesław Korzeniowski
Waldemar Bolesław Korzeniowski
KZKrzysztof Zagórski
Krzysztof Zagórski
AZAnna Zagórska
Anna Zagórska
The article presents methods of making the rock bolt support more yieldable, especially for a stratified roof. Alongside the increasing depth of exploitation of raw material deposits, rock bolt support units are more often designed taking into account more intensive deformations and displacements of underground excavations. In the article, a room and pillar method with mined roof bending and roof reinforcement with bolt patterns of 1 m × 1 m, 1.5 m × 1.5 m and 2 m × 2 m is presented. Moreover, the laboratory tests included 1.8 m long bolts, which were embedded segmentally on the lengths of 100 mm, 150 mm and 200 mm were tested. Based on the load–displacement characteristics, the deformation energy for flat and profiled dome bearing plates was calculated. Making the segmentally embedded resin rock bolt support yieldable enabled it to perform additional work. Furthermore, it was found that rock bolt support with a dome bearing plate took over 2.5 times more energy compared to a rock bolt support equipped with a flat bearing plate.

20 May 2022 in Energies
Verified
Journal Article
Open access
PDF file
Krzysztof SkrzypkowskiKrzysztof Skrzypkowski
Krzysztof Skrzypkowski
KZKrzysztof Zagórski
Krzysztof Zagórski
AZAnna Zagórska
Anna Zagórska
DADerek B. Apel
Derek B. Apel
Jun WangJun Wang
Jun Wang
Lijie GuoLijie Guo
Lijie Guo
The article presents a method of selecting an arch yielding support for preparatory workings driven in a hard coal seam. Particular attention was paid to discontinuous deformation in the form of a fault, which significantly contributes to the change of the excavation protection schemes. On the basis of the geometry of the machines and devices in the designed excavation, the support was selected, which was then checked for the ventilation criterion. In the next stage, analytical calculations were carried out using the determined spacing of the steel support in the fault zone and the area outside of it. Additionally, using the RS3 numerical software based on the finite element method, a rock mass model with a fault was built, through which the preparatory excavation passes. The aim of the research was to determine the total displacements occurring in the fault crossing zone for the excavation without support and with the use of steel arch yielding and with additional reinforcement in the form of straight segments. In conclusion, it was found that the variants of the excavation reinforcement can be modeled and selected in advance, which allows for the fastest possible execution of the driving and the maintenance of the minimum movement dimensions while passing through the fault.

30 September 2019 in Energies
Verified
Journal Article
Open access
PDF file
Krzysztof SkrzypkowskiKrzysztof Skrzypkowski
Krzysztof Skrzypkowski
WKWaldemar Bolesław Korzeniowski
Waldemar Bolesław Korzeniowski
KZKrzysztof Zagórski
Krzysztof Zagórski
AZAnna Zagórska
Anna Zagórska
This paper presents the results of laboratory tensile testing of segmentally-installed glue-in roof bolting. We studied roof bolting of the type Olkusz-16A (Boltech Sp. z o.o., ZGH Bolesław S.A., Bukowno, Poland), additionally equipped with a steel rod coil, which was mounted in steel cylinders filled with a concrete mixture using multi-part resin cartridges with a diameter of 0.024 m and length of 0.045 m. The mounting depths were 0.1 m and 0.2 m, respectively. Our main purpose was to determine the effect of the bolt hole diameter, which assumed the values 0.028 m, 0.032 m, 0.035 m, and 0.037 m, respectively, on the load-bearing capacity of the roof bolting in relation to the mounting depth. We found that the mounting depth of 0.2 m was sufficient for the roof bolting to exhibit its full load and displacement properties for all four diameters of the bolt hole. To determine whether the roof bolting was capable of transferring the load in situ, we presented the results of the predicted load on the roof bolting applied in a room and pillar mining method in an underground mine of zinc and lead ore deposits. Our objective was to determine the influence of the room and pillar mining method geometry on the range of the fault zone of rocks around pits. We designed the deposit excavation model using the Examine3D numerical modeling software, which is based on the boundary element method. We created three-dimensional models for three variants of working space opening widths: featuring two, three, and four rows of rooms. The geometry of rooms and pillars corresponded to the mine conditions; the width, height, and length parameters were all 5 m. We determined the strength, strain, and structural parameters of the rock mass on the basis of laboratory studies of the drill core and rock forms collected from the room longwall. We used the strength factor to specify the maximum range of the fault zone of rocks around pits. In the last stage of research, we compared the load value obtained based on numerical testing with the maximum load obtained in the tensile strength tests of the roof bolting and determined the safety factor of the segmentally-installed roof bolting.

23 December 2022 in Energies
Verified
Journal Article
Open access
PDF file
Krzysztof SkrzypkowskiKrzysztof Skrzypkowski
Krzysztof Skrzypkowski
René Esteban GómezRené Esteban Gómez
René Esteban Gómez
KZKrzysztof Zagórski
Krzysztof Zagórski
AZAnna Zagórska
Anna Zagórska
RGRoberto Gómez-Espina
Roberto Gómez-Espina
There are several massive deposits around the world with different geological characteristics. Thus, different mining methods and strategies are applied based on the particularity of each method and mine experience. Particularly, in this work, we review and summarize the underground exploitation of some world-class base metal deposits based on Poland and Chilean experiences. Here, the main geological and mining parameters of Poland and Chilean mines applied in massive deposits are reported and analyzed. In Poland, mainly room and pillar methods (and variants) have been applied in massive deposits. Here, back-filling is required to maintain the mine’s stability due to the large deposit size and open areas. In Chile, the block caving method is commonly used in massive underground deposits where less development is required. Here, the cave is naturally filled with broken material and a large subsidence zone is generated. In this review, it has been observed that different underground methods and strategies can be effectively used in massive deposits. Some parameters that influenced the method selection are mainly related to rock mechanics, ore recovery and dilution, subsidence zone, extraction rate, and mining experience. Here, key mining variables and parameters such as productivity, support, and equipment, as well as various issues related to the world-class deposit are studied. Additionally, a comparison between both experiences is presented, highlighting the main geological and mining parameters. This study can be used as a reference to evaluate the different option of underground mining methods to be applied in future massive mine projects with similar geological characteristics.