The traction motor realizes the mutual conversion of electrical energy and mechanical energy during the train traction and braking process and is a key component of high-speed trains. The normal operation of the motor is directly related to the safety of high-speed train operation. Changes in temperature signals can reflect faults in the traction motor. By analyzing the internal and external influencing factors of temperature signals, a multi-factor prediction model for traction motors is established based on the maximal information coefficient and improved support vector regression. In this model, highly relevant features selections are performed based on time-delayed sequences and the maximal information coefficient. Using the adaptive particle swarm algorithm to optimize the improved support vector regression algorithm can enhance its accuracy and efficiency. Furthermore, using the K-nearest neighbor algorithm for error prediction will yield more accurate results. By comparing the , , , and other evaluation metrics of different algorithms under various working conditions, the results show that the prediction method proposed in this paper performs well across different working conditions. This method demonstrates greater adaptability to varying conditions and is more suitable for applications involving high-speed trains.
With the high-density operations of high-speed trains, predicting the health status of core components such as traction motors is crucial for enhancing the safety and sustainability of trains. Currently, traditional maintenance mechanisms such as periodic inspections and fixed-threshold alarm systems are hindered by delayed abnormality detection and inadequate real-time responsiveness. This paper proposes a dynamic prediction method for traction motor states based on an Online Gated Recurrent Unit (OGRU), which considers various influencing factors and updates model parameters in real-time. Experimental results demonstrate that the online prediction model significantly reduces the compared to offline methods and exhibits increased prediction stability under different conditions and step sizes. Notably, it decreases computational time by 23.3% relative to the Online Long Short-Term Memory (OLSTM) approach. The proposed method enhances preventive maintenance strategies, optimizes resource utilization, extends equipment lifespan, and reduces costs, thereby making a substantial contribution to the sustainable operation of high-speed railways. By improving energy efficiency, safety, and economic viability, this approach supports a transition toward greener rail transportation. Based on this study, the developed method can facilitate real-time maintenance decision-making, enabling the intelligent operation and maintenance of high-speed trains.