It is known that it is critical for train rescheduling problem to address some uncertain disturbances to keep the normal condition of railway traffic. This paper is keen on a mathematical model to reschedule high-speed trains controlled by the quasi-moving blocking signalling system impacted by multidisturbances (i.e., primary delay, speed limitation, and siding line blockage). To be specific, a mixed-integer linear programming is formulated based on an improved alternative graph theory, by the means of rerouting, reordering, retiming, and train control. In order to adjust the train speed and find the best routes for trains, the set of alternative arcs and alternative arrival/departure paths are considered in the constraints, respectively. Due to this complex NP-hard problem, a two-step algorithm with three scheduling rules based on a commercial optimizer is applied to solve the problem efficiently in a real-word case, and the efficiency, validity, and feasibility of this method are demonstrated by a series of experimental tests. Finally, the graphical timetables rescheduled are analysed in terms of free conflicts of the solution. Consequently, the proposed mathematical model enriches the existing theory about train rescheduling, and it can also assist train dispatchers to figure out disturbances efficiently.
In this paper, a thorough investigation of the emergency evacuation capabilities of subway systems has been undertaken, employing a blend of theoretical models and simulation methodologies. Initially, a theoretical framework was established to estimate the evacuation duration for passengers transitioning from the train to a secure area while considering the spatial configuration and passenger flow dynamics of subway stations. Following this, a real-time visualization simulation model was developed, which integrates the dynamic aspects of passenger flow and the transportation capacity of evacuation bottlenecks across various segments. This model incorporates both spatial parameters and the travel behaviors of passengers. Ultimately, in accordance with actual operational needs, a simulation analysis was performed for substantial passenger volumes across three representative scenarios to assess the effectiveness and scientific validity of the theoretical calculation model. This study offers a foundational framework for the management of subway safety operations, facilitating the identification of evacuation bottlenecks and the implementation of emergency strategies for handling large passenger flows.
High density of buildings and the large traffic volume of cities give rise to narrow spaces and high passenger flows in most subway stations. When evacuation is required during an emergency, these problems may trigger issues in operational safety. Therefore, it is imperative to comprehensively assess subway station emergency evacuation times and capacities during the operating process to ensure the design is safe, science-based, and rational. To further enhance safe evacuation capacity, this paper proposes an overall evacuation time model that considers the multielement charac-teristics of subway stations in multiple segments. The evacuation route is decomposed into five stages according to the critical nodes in the evacuation process. An overall emergency evacuation time model is established based on the diversity of bottlenecks in the five stages, integrating elements such as the horizontal movement velocity of passengers, subway equipment parameters, and human density. Taking Xi’an Wulukou Subway Station as an example, this paper verifies the outcomes of the theoretical model against the Pathfinder software and conducts additional anal-yses of the evacuation conditions of stairs and exits. The results show that the error between the theoretical emergency evacuation time and simulation evacuation time was 5.4%, The emergency evacuation model established in this study boasts strong robustness and stability.