The observed development of offshore wind farms has resulted in an increasing presence of long extra-high voltage cables, with lengths ranging from 10 to 200 km. These cable lines are compensated for by a shunt reactor(s). The transient states that accompany switching operations, in this type of line, cause a number of challenges. There are slightly different and more dangerous phenomena than in classic uncompensated lines. One such phenomenon is the zero-missing phenomenon. The most effective methods for mitigating these phenomena are still under investigation and comparison to identify the optimal countermeasures. Applying a single minimization countermeasure often leads to avoiding one phenomenon (e.g., zero-missing phenomenon) while enhancing another (e.g., switching overvoltages). This can challenge designers, as they must consider the trade-offs between these competing objectives. The added value of this article is an analysis of the impact of the compensation level and its distribution (shunt reactor(s) location) in the offshore wind farm power export systems on zero-missing phenomenon and switching overvoltages. These analyses are supported by simulation cases mapping the case of the Polish power system. The results of the presented analysis are very important in light of a dynamic development of offshore wind farms and may be utilized by designers of power export systems, and can mitigate the significant risks occurring in such systems during energization cable lines.
The ongoing evolution of electric power systems (EPS), especially distribution systems within the EPS structure, is driven by the implementation of the smart grid framework. This requires new approaches and technologies to continue ensuring a reliable and secure supply to end users. Fluctuating output from solar photovoltaic and wind plants can cause voltage and power variations in the feeders. In the power grid framework, phasor measurement units (PMUs) are recognized to be an invaluable aid in ensuring the secure operation and stability of transmission systems. The synchrophasor technique requires a high-accuracy time stamping of all the measurements within the analyzed power system area. It must be emphasized that the harmonic injection from power electronic components such as fluorescent lighting, computers, and power inverters of motors and generators can increase total harmonic distortion (THD) levels on distribution feeders and modify the conventional patterns of voltage and current signals. Therefore, what is vital for the functional reliability of synchronous measurements is the implementation of measurement algorithms, which can realize high-accuracy measurements, both in quasi-static and dynamic EPS operating conditions. This article presents the results of software simulations and hardware tests of measurement algorithms that meet the requirements of the IEEE C37.118™-2011 Standard.