Hossam A.Gabbar

Prof. Dr. Hossam A.Gabbar

Faculty of Energy Systems and Nuclear Science, Ontario Tech University, Oshawa ON L1H 7K4 Canada
orcid

Research Focus & Metrics

Academic Career Length

15Years (2012-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
11 April 2021 in Technologies
Verified
Journal Article
Open access
PDF file
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar
AOAhmed M. Othman
Ahmed M. Othman
Md Rafiul AbdussamiMd Rafiul Abdussami
Md Rafiul Abdussami
The evolving global landscape for electrical distribution and use created a need area for energy storage systems (ESS), making them among the fastest growing electrical power system products. A key element in any energy storage system is the capability to monitor, control, and optimize performance of an individual or multiple battery modules in an energy storage system and the ability to control the disconnection of the module(s) from the system in the event of abnormal conditions. This management scheme is known as “battery management system (BMS)”, which is one of the essential units in electrical equipment. BMS reacts with external events, as well with as an internal event. It is used to improve the battery performance with proper safety measures within a system. Therefore, a safe BMS is the prerequisite for operating an electrical system. This report analyzes the details of BMS for electric transportation and large-scale (stationary) energy storage. The analysis includes different aspects of BMS covering testing, component, functionalities, topology, operation, architecture, and BMS safety aspects. Additionally, current related standards and codes related to BMS are also reviewed. The report investigates BMS safety aspects, battery technology, regulation needs, and offer recommendations. It further studies current gaps in respect to the safety requirements and performance requirements of BMS by focusing mainly on the electric transportation and stationary application. The report further provides a framework for developing a new standard on BMS, especially on BMS safety and operational risk. In conclusion, four main areas of (1) BMS construction, (2) Operation Parameters, (3) BMS Integration, and (4) Installation for improvement of BMS safety and performance are identified, and detailed recommendations were provided for each area. It is recommended that a technical review of the BMS be performed for transportation electrification and large-scale (stationary) applications. A comprehensive evaluation of the components, architectures, and safety risks applicable to BMS operation is also presented.

1 December 2015 in Energy
Verified
Journal Article
Closed access
AZAboelsood Zidan
Aboelsood Zidan
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar
AEAhmed Eldessouky
Ahmed Eldessouky

20 May 2021 in Journal of Radioanalytical and Nuclear Chemistry
Verified
Journal Article
Closed access
PDF file
SDSharif Abu Darda
Sharif Abu Darda
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar
VDVahid Damideh
Vahid Damideh
MAMohamed Aboughaly
Mohamed Aboughaly
IHIsaac Hassen
Isaac Hassen

11 July 2016 in Energies
Verified
Journal Article
Open access
PDF file
Khairy Fathy Abdelsayed SayedKhairy Fathy Abdelsayed Sayed
Khairy Fathy Abdelsayed Sayed
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar
This paper presents the control and simulation of an electric vehicle (EV) charging station using a three-level converter on the grid-side as well as on the EV-side. The charging station control schemes with three-level AC/DC power conversion and a bidirectional DC/DC charging regulator are described. The integration of EVs to the power grid provides an improvement of the grid reliability and stability. EVs are considered an asset to the smart grid to optimize effective performance economically and environmentally under various operation conditions, and more significantly to sustain the resiliency of the grid in the case of emergency conditions and disturbance events. The three-level grid side converter (GSC) can participate in the reactive power support or grid voltage control at the grid interfacing point or the common coupling point (PCC). A fuzzy logic proportional integral (FL-PI) controller is proposed to control the GSC converter. The controllers used are verified and tested by simulation to evaluate their performance using MATLAB/SIMULINK. The comparison of a PI-controller and a PI-Fuzzy controller for the EV charging station shows the effectiveness of the proposed FL-PI controller over conventional PI controller for same circuit operating conditions. A good performance for PI-Fuzzy in terms of settling time and peak overshoot can observed from the simulation results.

1 December 2014 in Energy and Buildings
Verified
Journal Article
Closed access
NANasser Ayoub
Nasser Ayoub
FMFarayi Musharavati
Farayi Musharavati
SPShaligram Pokharel
Shaligram Pokharel
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar

5 January 2018 in Energies
Verified
Journal Article
Open access
PDF file
MEMohamed El-Hendawi
Mohamed El-Hendawi
Hossam A.GabbarHossam A.Gabbar
Hossam A.Gabbar
GEGaber El-Saady
Gaber El-Saady
EIEl-Nobi A. Ibrahim
El-Nobi A. Ibrahim
Recently, significant development has occurred in the field of microgrid and renewable energy systems (RESs). Integrating microgrids and renewable energy sources facilitates a sustainable energy future. This paper proposes a control algorithm and an optimal energy management system (EMS) for a grid-connected microgrid to minimize its operating cost. The microgrid includes photovoltaic (PV), wind turbine (WT), and energy storage systems (ESS). The interior search algorithm (ISA) optimization technique determines the optimal hour-by-hour scheduling for the microgrid system, while it meets the required load demand based on 24-h ahead forecast data. The control system consists of three stages: EMS, supervisory control and local control. EMS is responsible for providing the control system with the optimum day-ahead scheduling power flow between the microgrid (MG) sources, batteries, loads and the main grid based on an economic analysis. The supervisory control stage is responsible for compensating the mismatch between the scheduled power and the real microgrid power. In addition, this paper presents the local control design to regulate the local power, current and DC voltage of the microgrid. For verification, the proposed model was applied on a real case study in Oshawa (Ontario, Canada) with various load conditions.