Jonas Ernst Bernhard Langner

Mr. Jonas Ernst Bernhard Langner


Research Focus & Metrics

Academic Career Length

4Years (2023-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
12 October 2023 in Aerospace
Verified
Journal Article
Open access
PDF file
BYBekir Yildiz
Bekir Yildiz
PFPeter Förster
Peter Förster
JLJonas Ernst Bernhard Langner
Jonas Ernst Bernhard Langner
TFThomas Feuerle
Thomas Feuerle
PHPeter Hecker
Peter Hecker
This paper presents a concept of a fast-time gate-to-gate simulation environment. The implementation is divided into an air traffic part that uses BADA performance parameters and a simulation of ground processes. The main objective of the flow-based hybrid simulation environment is to cover commercial European air traffic, in order to investigate network-related effects when exposed to disturbances. Based on historic traffic scenarios, the hybrid simulation platform enables the investigation of the local and global effects of a variety of disruptions. With respect to current flow-based models, it is intended to gain better insights into the underlying interdependencies by modelling higher levels of detail for selected parts, whilst covering the whole European air traffic network. After a validation and first calibration of the approach, Monte Carlo simulations, based on flight plans, are performed as proof of concept. This aims to illustrate the local effects of network-wide disturbances and is applied by means of stochastic influences of ground processes, gained from real operational data.

29 January 2026 in Aerospace
Verified
Journal Article
Open access
PDF file
Parth PurohitParth Purohit
Parth Purohit
JLJonas Ernst Bernhard Langner
Jonas Ernst Bernhard Langner
TFThomas Feuerle
Thomas Feuerle
PHPeter Hecker
Peter Hecker
Delays during turnaround operations are a significant source of operational inefficiency for airlines. They reduce airline profit margins by resulting in rescheduled flights and missed connections for passengers. This research paper presents the findings of an approach developed within the INTACT research project (subsequently called “the INTACT system”). The INTACT system aims to achieve reduced delays during turnaround operations and therefore increase their operational efficiency by introducing new technologies. A simulation study, including 350 simulated days, was conducted to assess the impact of three of INTACT’s abilities: (1) the localization of wheelchairs for passengers, (2) the assessment of what trolleys are onboard and how many trolley items are needed, and (3) visual observations of cabin failures and communication back to the destination airport. Results show that the implementation of these technologies leads to a statistically significant average delay reduction of 3 min per turnaround. Under the modeled schedule constraints in the discrete-event simulation, this reduction shifts the distribution of feasible daily flight counts, resulting in an average increase of 0.11 flights/day (38 additional completed flights over 350 simulated days) relative to the full-delay scenario. In addition, the cost–benefit analysis shows that the INTACT system saves an average of $966.95 in turnaround costs and gains $2714.29 in additional revenue per day and per aircraft. With estimated initial investment costs of around 2 million dollars, the payback period is only 1.5 years. During this study, gross additional revenue was reported as an upper-bound estimate; net operational benefit depends on airline-specific variable operating costs. The INTACT system can help to improve turnaround operation issues while providing positive economic performance for stakeholders in the industry.