Hongke Gao

Dr. Hongke Gao


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
17 May 2025 in Bulletin of Engineering Geology and the Environment
Verified
Journal Article
Closed access
PDF file
QWQi Wang
Qi Wang
FMFenglin Ma
Fenglin Ma
HGHongke Gao
Hongke Gao
BJBei Jiang
Bei Jiang
ZBZhenguo Bian
Zhenguo Bian

30 May 2025 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
CZChongyang Zhang
Chongyang Zhang
WLWei Li
Wei Li
HGHongke Gao
Hongke Gao
YHYueyong Han
Yueyong Han
ZZZhaosen Zhang
Zhaosen Zhang
BWBaoqi Wang
Baoqi Wang

30 June 2025 in Mining, Metallurgy & Exploration
Verified
Journal Article
Closed access
PDF file
WLWei Li
Wei Li
CZChongyang Zhang
Chongyang Zhang
HGHongke Gao
Hongke Gao
YCYang Chen
Yang Chen
SWShuai Wang
Shuai Wang
JWJiuhong Wang
Jiuhong Wang

30 April 2026 in Measurement
Verified
Journal Article
Closed access
QWQi Wang
Qi Wang
FMFenglin Ma
Fenglin Ma
HGHongke Gao
Hongke Gao
BJBei Jiang
Bei Jiang
ZBZhenguo Bian
Zhenguo Bian
BPBo Pang
Bo Pang

5 September 2026 in Rock Mechanics and Rock Engineering
Verified
Journal Article
Closed access
PDF file
QWQi Wang
Qi Wang
ZBZhenguo Bian
Zhenguo Bian
HGHongke Gao
Hongke Gao
BJBei Jiang
Bei Jiang
ZYZixiong Yang
Zixiong Yang

20 September 2026 in Eng
Verified
Journal Article
Open access
PDF file
MWMingfa Wang1 Mingfa Wang1
Mingfa Wang1 Mingfa Wang1
HGHongke Gao
Hongke Gao
GGGuangming Guo
Guangming Guo
ZBZhenguo Bian
Zhenguo Bian
CXChangjing Xu
Changjing Xu
XMXinjie Man
Xinjie Man
A large-section tunnel has a large excavation span and high construction difficulty and is prone to roof fall and collapse and other engineering disasters under complex geological conditions. Due to the influence of the size effect, it is difficult for surrounding rock to form an arch and form an effective load-bearing structure. A timely and proactive anchoring support system is required to fully utilize the self-bearing capacity of the surrounding rock. Therefore, this paper studies a case of high-prestressed active support based on a large cross-section tunnel in eastern China, clarifying that high-prestressed active support can effectively control rock stress, plastic zone distribution, and surrounding rock deformation. Based on a prestress conversion test, the support structure and application method that meet the high-prestress application requirements of the tunnel engineering site are clearly defined. An active support field test was carried out, and the influence of prestress on the supporting structure stress and the surrounding rock deformation was analyzed. The results show that compared with a no-prestress support scheme, active support with 100 kN high prestress increased the utilization rate of anchor rod strength by 35.29%, reduced the external load on the arch by 40.9%, and reduced the settlement of the arch crown by 34.9%. This indicates that high-prestressed active support can improve the self-bearing capacity and control effect of the surrounding rock.