Pre-stressed high-strength concrete pipe piles (PHC pipe piles) have been widely used in actual soft foundation treatment projects due to their reliable quality, fast construction, assembly line production, and environmental friendliness. However, large-scale slip damage still occurs in construction projects. In order to reduce and avoid such accidents, a highway in Guangdong (section K31+100~K31+388) was taken as an example for this study. Plaxis 2D software (V22.01.00) was used to establish a PHC pipe pile composite roadbed model and investigate the effects of tie beam form, pile lengths, pile spacings, pile verticality, and embankment filling loading modes on the settlement and stability of the composite roadbed. The results show that the original treatment plan, which had the form of a PHC pipe pile with caps, had a low horizontal bearing capacity and a poor anti-disturbance ability, leading to the occurrence of a landslide accident. A comparison of different structural forms revealed that the longitudinal and transverse tie beam form was the most stable, followed by the transverse tie beam form, longitudinal tie beam form, PHC pipe pile form with caps, and PHC pipe pile form without caps. Compared to the structural form of PHC pipe piles with pile caps, the stabilities of the transverse tie beam form and the longitudinal tie beam form were improved by 42.47% and 38.61%, respectively, while that of the longitudinal and transverse tie beam form was improved by 50.87%. The application of longitudinal and transverse tie beams effectively reduced the settlement of the composite roadbed, as confirmed by both measured data and finite element analysis. This structure achieved the desired vertical settlement control and lateral anti-slip effects.
The disturbance generated during the pile installation process increased the compressibility of the soil between the piles, thereby causing additional settlement of the composite foundation. This study was conducted against the background of a highway soft foundation treatment project in Zhongshan. Before and after the installation of cement mixing piles (CMP) and pre-stressed high-strength concrete pipe pile (PHC), a piezocone penetration test (CPTU) was applied to assess the soil between the piles and quantify the disturbance. Based on this, the settlement of the composite foundation was predicted using the stress modified method and finite element method (FEM). The results indicate that under low embankment load (<2.5 m), the installation of PHC piles reduces the compression modulus of the soil between the piles by approximately 30%, while CMP results in a reduction of about 10%. Disturbance settlement from CMP and PHC piles accounts for approximately 3–10% and 17–28% of the total settlement, respectively. This impact diminishes with the increase of embankment load.