Flood control operation in a multi-reservoir system is a multi-criteria decision-making (MCDM) problem, in which the considered criteria are often correlated with each other. In this paper, we propose an MCDM model for reservoir flood control operation to deal with correlation among criteria. Considering the flood control safety of reservoirs and downstream protected regions, we establish the hierarchical structure of the criterion system. We use the principal component analysis method to eliminate the correlation, and transform the original criterion system into an independent comprehensive criterion system. The comprehensive decision matrix coupled with the weight vector obtained by the improved entropy weight method serves as the input to TOPSIS method, fuzzy optimum method, and fuzzy matter-element method, by which we determine the ranking order of the alternatives. We apply the proposed model to a cascade system of reservoirs at the Daduhe River basin in China. The results show that the dimensionality of the criterion system is reduced and the correlation among criteria is eliminated simultaneously, and the ranking order of the alternatives is reasonable. The proposed model provides an effective way to deal with correlation among criteria, and can be extended to wider applications in many other MCDM problems.
Transboundary river water resources allocation is important in water resources management. Conflicts often arise when different water users compete for a limited water supply. This study proposes a two-level asymmetric Nash–Harsanyi Leader–Follower game model to resolve conflicts of interest in transboundary river water resources allocation problems. In the proposed model, we use bankruptcy theory to derive disagreement points and determine the bargaining weights considering the principles of equity and efficiency. For comparison, a model that does not consider disagreement points and bargaining weights are also used to demonstrate the importance of disagreement points and bargaining weights. The proposed model is applied to a real case of the Huaihe River basin in China, which is facing water shortages. In the case study, the watershed management agency serves as the leader, three provinces (Henan, Anhui and Jiangsu) serve as followers, and successive linear programming is used to solve the model for followers. The results show that the proposed disagreement points can guarantee basic water demand, and the bargaining weights can better balance the economic development levels among followers.
10 May 2016 in Stochastic Environmental Research and Risk Assessment
Streamflow simulation gives the major information on water systems to water resources planning and management. The monthly river flows in dry season often exhibit high autocorrelation. The headwater catchment of the Yellow River basin monthly flow series in dry season exhibits this clearly. However, existing models usually fail to capture the high-dimensional, nonlinear dependence. To address this issue, a stochastic model is developed using canonical vine copulas in combination with nonlinear correlation coefficients. Kendall’s tau values of different pairs of river flows are calculated to measure the mutual correlations so as to select correlated streamflows for every month. Canonical vine copula is used to capture the temporal dependence of every month with its correlated streamflows. Finally, monthly river flow by the conditional joint distribution functions conditioned upon the corresponding river flow records was generated. The model was applied to the simulation of monthly river flows in dry season at Tangnaihai station, which controls the streamflow of headwater catchment of Yellow River basin in the north of China. The results of the proposed method possess a smaller mean absolute error (MAE) than the widely-used seasonal autoregressive integrated moving average model. The performance test on seasonal distribution further verifies the great capacity of the stochastic-statistical method.
Real-time flood control operations of a cascade reservoir system under emergency conditions can reduce the social and economic loss caused by natural disasters. This paper proposes a risk-based model for real-time flood control operation of reservoirs under emergency conditions and uncertainties. The proposed model consists of three modules: emergency scenarios establishing, Monte Carlo simulations, and risk analysis. The emergency scenarios considered are earthquakes, extreme floods and failure of the spillways of a reservoir. The uncertainty factor considered is the forecast error of reservoir inflows, arising from model structural uncertainty and parameter estimating. The Monte Carlo simulations conduct the real-time flood control operation of reservoirs considering the proposed emergency events and uncertainties. The module of risk analysis performs the assessment of the operation schedules and calculates the risk of dam overtopping, based on the results from Monte Carlo simulations. The proposed model is applied to a cascade reservoir system in the upper reaches of Daduhe river basin in China. The results show that the maximum initial water level of the Shuangjiangkou reservoir is 2447 m a.s.l. (meters above sea level) using the release capacity model and is 2444.5 m a.s.l. using the command model under the scenario of upstream dam break. The integrated risk of the reservoir increases with the initial water level and the uncertainty degree of the reservoir inflows. The decision-makers can choose the operation models according to the actual initial water level of the reservoir under different emergency scenarios.