Samrad Jafarian-Namin

Dr. Samrad Jafarian-Namin

orcid

Research Focus & Metrics

Academic Career Length

7Years (2020-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 March 2021 in Journal of Statistical Computation and Simulation
Verified
Journal Article
Closed access
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin
MNMohammad saber Fallah nezhad
Mohammad saber Fallah nezhad
RTReza Tavakkoli-Moghaddam
Reza Tavakkoli-Moghaddam
ASAli Salmasnia
Ali Salmasnia
SGS.M.T. Fatemi Ghomi
S.M.T. Fatemi Ghomi
Few studies have investigated the integration of triple components including statistical process monitoring (SPM), maintenance policy (MP), and economic production quantity (EPQ). Of those, no research is found to monitor autocorrelated data. Moreover, although delayed monitoring (DM) policy was proposed for an integrated model of SPM and MP, it has not been extended by considering EPQ. We propose an integrated model of triple components subject to some constraints, in which the following features are considered: (1) DM policy that postpones the monitoring action until a determinable time to avoid the possible unnecessary costs, and (2) autocorrelation that, if ignored, can lead to a significant influence on the statistical performance of traditional control charts. ARMA control chart is used to monitor the autocorrelated data. Due to the complexity of the model, a particle swarm optimization algorithm is applied to obtain optimal solution(s). An industrial example, some comparisons and sensitivity analysis are provided for more investigations.

6 January 2021 in Engineering Reports
Verified
Journal Article
Open access
PDF file
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin
SGSeyyed Mohammad Taghi Fatemi Ghomi
Seyyed Mohammad Taghi Fatemi Ghomi
MSMohsen Shojaie
Mohsen Shojaie
SSSaeed Shavvalpour
Saeed Shavvalpour
Box‐Jenkins methodology is one of the most famous modeling approaches to describe the underlying stochastic structure and forecasting future values of various phenomena. In this methodology, the models are of type ARIMA, that is, autoregressive integrated moving average. Some advantages of those include robustness, easiness to use, and wide applicability in various disciplines ranging from engineering to economics. Inflation has been a highly discussed issue in economics. This research focuses on modeling and forecasting the yearly inflation rate of Iran from 1960 to 2019 using ARIMA. According to various measures, different ARIMA models are investigated to confirm their effectiveness. It is here showed that non‐seasonal ARIMA (1,0,0) is the most appropriate model for this application.

31 July 2024 in Computers & Industrial Engineering
Verified
Journal Article
Closed access
ASAli Salmasnia
Ali Salmasnia
RKReza Kia
Reza Kia
SGSamira Googoonani
Samira Googoonani
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin

12 November 2024 in Journal of Statistical Computation and Simulation
Verified
Journal Article
Closed access
MSMohsen Shojaee
Mohsen Shojaee
SNSiamak Noori
Siamak Noori
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin
FHFarid Hassanvand
Farid Hassanvand
Arne JohannssenArne Johannssen
Arne Johannssen

18 April 2022 in Quality Technology & Quantitative Management
Verified
Journal Article
Closed access
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin
MNMohammad saber Fallah nezhad
Mohammad saber Fallah nezhad
RTReza Tavakkoli-Moghaddam
Reza Tavakkoli-Moghaddam
ASAli Salmasnia
Ali Salmasnia
Organizations that achieved higher capabilities to meet expectations by successfully implementing quality improvement plans can make adjustments to process monitoring without any losses for customers. This approach may reduce costs due to desensitization in monitoring. In this regard, the acceptance control chart (ACC) under the assumptions of independence and normality has already been introduced. However, in practice, particular correlation patterns can be extracted among samples that violate the assumption of independence. Autocorrelation reduces the performance of traditional control charts. In the present study, three types of ACC are extended for monitoring the mean of the most widely used autocorrelated processes. The performance of the proposed charts is evaluated using statistical measures. It is found that the residual-based exponentially weighted moving average ACC (R-EWMA-ACC) has the best performance. Also, two numerical examples illustrate its application. Moreover, optimizing the economic-statistical model indicates that the R-EWMA-ACC spends less than the ARMA control chart.

7 May 2024 in Stochastics and Quality Control
Verified
Journal Article
Closed access
FEFateme Eskandari-Kataki
Fateme Eskandari-Kataki
MOMohammad Saleh Owlia
Mohammad Saleh Owlia
SJSamrad Jafarian-Namin
Samrad Jafarian-Namin
We aim to extend the Markov System Dynamic method (MSD) to evaluate the reliability of repairable systems in two-state weather (2SW) models. Increasing the number of components in real practices has limited the use of the Markov method, because of increasing the number of equations and the complexity of the problem. There is no such restriction in the MSD method. Thus, it can be applied to complex systems. Theoretically, we indicate that the 2SW model is a type of linear dynamical system. Therefore, we can use MSD to solve it. Through an example, the validity of the proposed method is confirmed in comparison to the Markov method for the 2SW model. Since the MSD method does not use equations, it can be a preferred alternative for calculating the reliability of 2SW models. Accordingly, we apply the MSD method for assessing the reliability of a four-component system.