Dongsheng He

Mr. Dongsheng He

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 January 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
DHDongsheng He
Dongsheng He
SQShunquan Qin
Shunquan Qin
HXHaizhu Xiao
Haizhu Xiao
Suiwen WuSuiwen Wu
Suiwen Wu
The hybrid cable-stayed suspension bridge is used to combine the advantages of cable-stayed and suspension bridges and hence has a broad prospect for application. The conventional simplified analytical models of the hybrid bridge are usually developed based on a schematic with the cable-stayed and suspension systems working separately without any overlapping zone, which cannot represent the modern hybrid bridge system. In this study, a novel analytical model is proposed based on the modified suspension–elastic foundation beam theory to estimate the mechanical performance and deflection of the hybrid bridge system with the consideration of the overlapped section between the suspension and stayed cables. The governing equations of the hybrid bridge system are developed based on the elastic foundation beam theory and the deflection theory, which are derived separately in the hybrid section, the pure suspension section and the cable-stayed section. The general solution of each section is presented. The Transfer Matrix Method is then employed to solve the unknowns from one end to the other, which are in turn used to solve the internal forces of the hybrid bridge system caused by the concentrated load. In addition, in view of no variation in the unstressed length of the main cable, the compatibility equation of the main cable is established with consideration of the longitudinal displacement of the main tower, which is used to derive the formulas for the internal force and deflection of the hybrid system. The model can be easily complied in any programming platform, such as Matlab, with simple input parameters, which can eliminate the complex finite element modeling process. Hence, it can be easily used in the preliminary design stage to determine the optimal size and layout of the bridge. Then, a case study is presented for the verification of the proposed model under a vertical load, which is simplified from the Xihoumen Bridge, a combined highway and railway bridge with a main span of 1488 m. Good agreement is obtained between the proposed model and the finite element method. Meanwhile, it is found that there exists a negative deflection zone for the main beam at a distance from the concentrated vertical load, which is mainly caused by the deflection of the main cables, leading to the cambering of the beam.

27 April 2026 in Advances in Structural Engineering
Verified
Journal Article
Closed access
DHDongsheng He
Dongsheng He
HXHaizhu Xiao
Haizhu Xiao
JWJianguo Wang
Jianguo Wang
KWKai Wei
Kai Wei
YLYongle Li
Yongle Li
DMDapeng Mei
Dapeng Mei
Hybrid cable-stayed suspension bridges provide an attractive solution for super long spans, yet the fatigue behavior of end hanger under moving loads remains a critical concern. This study investigated the fatigue mechanism of the end hanger in a hybrid cable-stayed suspension bridge through force decomposition, finite element validation, and parametric analysis. An explicit analytical framework was developed to decompose the moving-load-induced force variation of end-hanger into physically meaningful components, and the proposed framework was validated against finite element results, with only a 1.1% difference in the peak positive value of the end-hanger force influence line. The results show that the fatigue behavior of the end hanger is governed by coupled force components, among which the rotation-related component is dominant because of the rotation mismatch between the first cable segment and the interior cable segments. Then the effects of key structural parameters were quantified. The increase of vertical bending stiffness of the girder, main-cable sag and the bonding zone length can improve fatigue performance efficiently. Moreover, the moving-load-induced response of the end hanger is governed by the coupled stiffness of the girder-cable system. The variation of stay-cable axial stiffness apparently influences both the force range and stress range of the end hanger, while the main-cable axial stiffness aggravates the fatigue demand. An increased hanger axial stiffness from an enlargement section reduces the corresponding stress and significantly improves the fatigue life.