Mohammed Ali Ahmed

Dr. Mohammed Ali Ahmed

orcid

Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
5 April 2025 in CivilEng
Verified
Journal Article
Open access
PDF file
SMSuha falih Mahdi
Suha falih Mahdi
Mohammed Ali AhmedMohammed Ali Ahmed
Mohammed Ali Ahmed
SASaja Al-Dhamad
Saja Al-Dhamad
HIHAMZA Imran
HAMZA Imran
Luís BernardoLuís Bernardo
Luís Bernardo
Hugo A.S. PintoHugo A.S. Pinto
Hugo A.S. Pinto
This study aims to develop a reliable method for predicting power plant construction costs during the early planning stages using ensemble machine learning techniques. Accurate cost predictions are essential for project feasibility, and this research highlights the strength of ensemble methods in improving prediction accuracy by combining the advantages of multiple models, offering a significant improvement over traditional approaches. This investigation employed the Random Forest (RF) algorithm to estimate the overall construction cost of a power plant. The RF algorithm was contrasted with single-learner machine learning models: Support Vector Regression (SVR) and k-Nearest Neighbors (KNN). Performance measures, comprising the coefficient of determination (R2), Mean Absolute Error (MAE), and Root Mean Squared Error (RMSE), were used to evaluate and contrast the performance of the implemented models. Statistical measures demonstrated that the RF approach surpassed alternative models, demonstrating the highest coefficient of determination for testing (R2=0.956) and the lowest Root Mean Square Error (RMSE = 29.27) for the testing dataset. The Shapley Additive Explanation (SHAP) technique was implemented to explain the significance and impact of predictor factors affecting power plant construction costs. The outcomes of this investigation provide crucial information for project decision-makers, allowing them to reduce discrepancies in projected costs and make informed decisions at the beginning of the construction phase.

2 September 2025 in Eng
Verified
Journal Article
Open access
PDF file
FTFarah Faaq Taha
Farah Faaq Taha
Mohammed Ali AhmedMohammed Ali Ahmed
Mohammed Ali Ahmed
SASaja Al-Dhamad
Saja Al-Dhamad
HIHAMZA Imran
HAMZA Imran
Luís BernardoLuís Bernardo
Luís Bernardo
Miguel C. S. NepomucenoMiguel C. S. Nepomuceno
Miguel C. S. Nepomuceno
Efficient labor productivity forecasting is a critical challenge in construction engineering, directly influencing scheduling, cost control, and resource allocation. In reinforced concrete projects, accurate prediction of rebar-fixing productivity enables managers to optimize workforce deployment and mitigate delays. This study proposes a machine learning-based framework to forecast rebar-fixing labor productivity under varying site and environmental conditions. Four regression algorithms—Random Forest (RF), Extreme Gradient Boosting (XGBoost), Support Vector Regression (SVR), and k-Nearest Neighbors (KNN)—were trained, tuned, and validated using grid search with k-fold cross-validation. RF achieved the highest accuracy, with an R2 of 0.901 and RMSE of 19.94 on the training set and an R2 of 0.877 and RMSE of 22.47 on the test set, indicating strong generalization. Model interpretability was provided through SHapley Additive exPlanations (SHAP), revealing that larger quantities of M32 and M25 rebars increased productivity, while higher temperatures reduced it, likely due to lower labor efficiency. Humidity, wind speed, and precipitation showed minimal influence. The integration of accurate predictive modeling with explainable machine learning offers practical insights for project managers, supporting data-driven decisions to enhance reinforcement task efficiency in diverse construction environments.