Jaehyun Choi

Dr. Jaehyun Choi


Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
30 April 2018 in Sustainability
Verified
Journal Article
Open access
PDF file
JCJaehyun Choi
Jaehyun Choi
JXJia Xuelei
Jia Xuelei
Woonseong JeongWoonseong Jeong
Woonseong Jeong
Concrete is one of the most important, versatile, and widely used building materials worldwide. Thus, an optimized delivery schedule of ready-mixed concrete (RMC) is a critical issue that can reduce CO2 emission from RMC delivery vehicles. RMC is the most popular form of concrete material supplied to construction projects. When delivering RMC to construction sites, optimizing the transportation can be complex since there are many alternatives in terms of route choice. The objective of this research was to optimize the travel operation of RMC delivery vehicles to ensure that they travel via the most economical routes. The researchers developed a dynamic simulation model to solve this vehicle scheduling problem (VSP), applied an ant colony optimization (ACO) algorithm as a mathematical model, and analyzed the results achieved by the basic and improved ACO methods; the goals were to reduce travel distance and improve the simulation’s performance. Ultimately, the researchers found that the improved ACO method provided a more optimized transportation solution with a higher level of efficiency.

19 February 2021 in KSCE Journal of Civil Engineering
Verified
Journal Article
Open access
PDF file
HIHaekyung Im
Haekyung Im
MHMinhui Ha
Minhui Ha
DKDonghee Kim
Donghee Kim
JCJaehyun Choi
Jaehyun Choi
This research standardizes a knowledge structure for estimation in the construction field by creating a method to enhance cost management efficiency of construction projects while meeting the need for reusability of accumulated construction information. The construction knowledge structure was developed to execute the project cost estimation with an ontological concept. The knowledge framework was defined and relevant examples were addressed to explain the structure. The detailed estimation process and methodology for using standard unit price information was also developed to strengthen cost information interoperability by utilizing standard classification systems, such as MasterFormat, UniFormat, UniClass, and ISO 12006. This concept may be proposed as a method of connecting construction information based on a standard cost classification system in order to improve estimation efficiency by increasing the connectivity of cost information. Ontology can be a powerful tool when used in conjunction with interoperability to manage the massive volume of construction information for cost management. This methodology can expand to integrated management in cost and time to derive additional classes for work breakdown structure (WBS). Thus, ontology may improve the efficiency of cost estimation and systematization by reusing construction information. As a further step, the interoperability method will enhance overall construction project management.

12 April 2020 in Sustainability
Verified
Journal Article
Open access
PDF file
JCJaehyun Choi
Jaehyun Choi
While for years most American State Highway Agencies (SHAs) have performed Road User Cost (RUC) calculations, no uniformity from state to state has been established. There is scant research available that documents the testing and validation of existing RUC calculation methods for highway rehabilitation projects. Especially scarce are studies addressing the unique problem of accurately calculating RUC in the event of lane closures. This research addresses this problem by describing and comparing two methods of making such calculations: A manual method developed by the Texas Transportation Institute (TTI), and adopted by many other state agencies, such as the Florida Department of Transportation (FDOT), and a commercial software package.

22 August 2023 in Applied Sciences
Verified
Journal Article
Open access
PDF file
JCJaehyun Choi
Jaehyun Choi
MHMinhui Ha
Minhui Ha
JLJin Gang Lee
Jin Gang Lee
As improper inspection of construction works can cause an increase in project costs and a decrease in project quality, construction inspection is considered a critical factor for project success. While traditional inspection tasks are still mainly labor-intensive and time-consuming, computer vision has the potential to revolutionize the construction inspection process by providing more efficient and effective ways to monitor the progress and quality of construction projects. However, previous studies have also indicated that the performance of vision-based site monitoring heavily relies on the volume of training data. To address the issues of challenging data collection at construction sites, this study developed models using transfer learning-based object detection models incorporating data augmentation and transfer learning. The performance of three object detection algorithms was compared based on average precision and inference time for detecting T/S bolt fastening of steel structure. Despite the limited training data available, the model’s performance was improved through data augmentation and transfer learning. The proposed inspection model can increase the efficiency of quality control works for building construction projects and the safety of inspectors.

4 December 2019 in Lecture Notes in Electrical Engineering
Verified
Book Chapter
Closed access
PDF file
JCJaehyun Choi
Jaehyun Choi
HWHankyeom Wang
Hankyeom Wang

10 August 2026 in Journal of Asian Architecture and Building Engineering
Verified
Journal Article
Open access
SJSeunghwan Jeong
Seunghwan Jeong
SKSeahyun Kim
Seahyun Kim
JSJeonggyu Song
Jeonggyu Song
JCJaehyun Choi
Jaehyun Choi
1. The construction industry serves as a pivotal sector at the national level, contributing to the enhancement of urban competitiveness, job creation, and revitalization of adjacent industries. Com...