Xiaojie Zhou

Dr. Xiaojie Zhou


Research Focus & Metrics

Academic Career Length

10Years (2017-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
7 November 2018 in Energies
Verified
Journal Article
Open access
PDF file
YGYajing Gao
Yajing Gao
XZXiaojie Zhou
Xiaojie Zhou
JRJiafeng Ren
Jiafeng Ren
XWXiuna Wang
Xiuna Wang
DLDongwei Li
Dongwei Li
As renewable energies become the main direction of global energy development in the future, Virtual Power Plant (VPP) becomes a regional multi-energy aggregation model for large-scale integration of distributed generation into the power grid. It also provides an important way for distributed energy resources (DER) to participate in electricity market transactions. Firstly, the basic concept of VPP is outlined, and various uncertainties within VPP are modeled. Secondly, using multi-agent technology and Stackelberg dynamic game theory, a double-layer nested dynamic game bidding model including VPP and its internal DERs is designed. The lower layer is a bidding game for VPP internal market including DER. VPP is the leader and each DER is a subagent that acts as a follower to maximize its profit. Each subagent uses the particle swarm algorithm (PSA) to determine the optimal offer coefficient, and VPP carries out internal market clearing with the minimum variance of unit profit according to the quoting results. Then, the subagents renew the game to update the bidding strategy based on the outcomes of the external and internal markets. The upper layer is the external market bidding game. The trading center (TC) is the leader and VPP is the agent and the follower. The game is played with the goal of maximum self-interest. The agent uses genetic algorithms to determine the optimal bid strategy, and the TC carries out market clearance with the goal of maximizing social benefits according to the quotation results. Each agent renews the game to update the bidding strategy based on the clearing result and the reporting of the subagents. The dynamic game is repeated until the optimal equilibrium solution is obtained. Finally, the effectiveness of the model is verified by taking the IEEE30-bus system as an example.

26 April 2018 in Energies
Verified
Journal Article
Open access
YGYajing Gao
Yajing Gao
XZXiaojie Zhou
Xiaojie Zhou
JRJiafeng Ren
Jiafeng Ren
ZZZheng Zhao
Zheng Zhao
FXFushen Xue
Fushen Xue
The openness of the electricity retail market results in the power retailers facing fierce competition in the market. This article aims to analyze the electricity purchase optimization decision-making of each power retailer with the background of the big data era. First, in order to guide the power retailer to make a purchase of electricity, this paper considers the users’ historical electricity consumption data and a comprehensive consideration of multiple factors, then uses the wavelet neural network (WNN) model based on “meteorological similarity day (MSD)” to forecast the user load demand. Second, in order to guide the quotation of the power retailer, this paper considers the multiple factors affecting the electricity price to cluster the sample set, and establishes a Genetic algorithm- back propagation (GA-BP) neural network model based on fuzzy clustering (FC) to predict the short-term market clearing price (MCP). Thirdly, based on Sealed-bid Auction (SA) in game theory, a Bayesian Game Model (BGM) of the power retailer’s bidding strategy is constructed, and the optimal bidding strategy is obtained by obtaining the Bayesian Nash Equilibrium (BNE) under different probability distributions. Finally, a practical example is proposed to prove that the model and method can provide an effective reference for the decision-making optimization of the sales company.

22 August 2018 in Energies
Verified
Journal Article
Open access
PDF file
TGTong Guo
Tong Guo
YGYajing Gao
Yajing Gao
XZXiaojie Zhou
Xiaojie Zhou
YLYonggang Li
Yonggang Li
JLJiaomin Liu
Jiaomin Liu
Due to the randomness, volatility and intermittent nature of wind power, power systems with significant wind penetration face serious “curtailment” problems. The flexibility of a power system is an important factor that affects the large-scale consumption of wind power. Based on this fact, this paper takes into account the economics and flexibility of the system, and proposes an optimal scheduling method that takes the flexibility of each thermal power unit into account. Firstly, a comprehensive evaluation index system of thermal power unit flexibility is designed by an analytic hierarchy process and entropy method. The system covers the technical indexes and economic characteristics of thermal power units and is able to quantitatively evaluate the different types of thermal power units in the system. Secondly, a multi-objective optimization scheduling model involving the overall flexibility of the unit and the total power generation cost is established. Finally, the correctness and effectiveness of the proposed indicators and models are verified by a case study.

19 January 2017 in The Journal of Engineering
Verified
Journal Article
Open access
PDF file
XZXiaojie Zhou
Xiaojie Zhou
YGYajing Gao
Yajing Gao
WYWenhai Yang
Wenhai Yang
SGShixiao Guo
Shixiao Guo
This study considers China's new electricity reform and related policies as a prerequisite, makes depth analysis of the power generation and sales companies bidding model, and puts forward the game strategy of single sales company and multiple power producers that considered network constraints based on the principle of dark auction in game theory. Considering the problem of transmission obstruction, a two‐layer optimisation model is established. The lower level makes the maximum profit of the generator as the objective function, using the probability function to describe the quotation behaviour of the competitors, using the average match method to solve the bidder's bid. According to the underlying information, the upper single sales company uses linear programming methods to give low‐cost unit queuing priority, combined with grid operating constraints to calculate the minimum purchase cost. Through the upper and lower models, interactive solution can improve the transaction success rate and reduce the occurrence of transmission congestion. Finally, the modified IEEE14 node example is used to analyse and verify.