Due to extreme rainfall in 2010 in the Lusatian Neisse River catchment area (in Poland), a flood event with a return period of over 100 years occurred, leading to the failure of the Niedów dam. The earth-type dam constructed for cooling the Turów power plant was washed away, resulting in the rapid release of nearly 8.5 million m3 of water and the flooding of the downstream area with substantial material losses. Here we analyze the conditions and causes of the dam’s failure, with special attention given to the mechanism and dynamics of the compound breaching process, in which the dam’s upstream slope reinforcement played a specific and remarkable role. The paper also describes a numerical approach for simulating a combined flood event downstream from the dam with the use of a two-dimensional hydrodynamic model (MIKE21). Considering the specific local conditions, i.e., wide floodplain, meandering character of the main channel, embankment overtopping, and available data set, an iterative solution of the unsteady state problem is proposed. This approach enables realistic flood propagation estimates to be delivered, the dam breach outflow to be reconstructed, and several important answers concerning the consequences of the dam’s failure to be provided. Finally, the paper presents the reconstruction of the dam that is more resilient to extreme hydrological conditions under changing climate.
Due to extreme rainfall in 2010 in the Lusatian Neisse River catchment area, a flood event with a return period of over 100 years occurred, leading to the failure of the Niedów dam. The earth-type dam was washed away, resulting in the rapid release of nearly 8.5 million m3 of water and the flooding of the downstream area with substantial material losses. The paper analyses the conditions and causes of the dam’s failure, with special attention given to the mechanism and dynamics of the compound breaching process, in which the dam’s upstreeam slope reinforcement played a remarkable role. The paper also describes a numerical approach for simulating a combined flood event along the Lusatian Neisse River with the use of a two-dimensional hydrodynamic model (MIKE21). The flood event occurred downstream from the dam. Considering the specific local conditions and available data set, an iterative solution of the unsteady state problem is proposed. This approach enables realistic flood propagation estimates to be delivered, the dam breach outflow to be reconstructed, and several important answers concerning the consequences of the dam’s failure to be provided.
This paper presents a methodology of calculating the water transfer capacity of a dyke pumping station in flood wave conditions in order to improve its functioning, especially with regards to the safety of the areas being drained. The exemplary analysis was carried out for a pumping station situated on a small right-bank tributary of the Odra River in the southwest part of Poland, which, due to the inadequate capacity of its pumps, extensively flooded the surrounding areas in May and June 2010. Hydrological analyses were conducted in order to determine the rate of the designed and control flows using a spatial regression equation, and as a comparison, the rainfall-runoff method was also used. The corresponding flood-wave hydrographs were also determined, which included total precipitation using the German Association For Water Resources and Land Improvement (DVWK) method, effective precipitation using the Natural Resource Conservation Service curve number (NRCS-CN) method, as well as hypothetical waves using the instantaneous unit hydrograph (IUH) method. Flood-wave routing was carried out and alternative solutions for both the output of the required pumps and the retarding reservoir capacity were highlighted on this basis. The paper presents the possibility of a correct pump capacity selection, and in turn, the size of the pumping station retarding reservoir that results from this selection. This will enable pumping station exploitation costs or maintenance costs of the retarding reservoir to be considerably reduced.
The extension of the Żelazny Most tailings store facility (TSF), which is the largest in Europe, requires the transport of large amounts of tailings, e.g., from the central area of the TSF reservoir to the new southern extension (SE). In order to use the mature fine tailings deposits located under the clarified water in the TSF reservoir, which were thickened in the process of natural sedimentation, it was decided to choose suction dredgers that collect tailings a few meters from under the water surface. The dredgers, which are most commonly used for the extraction of sand or gravel, showed the ability to pump fine flotation tailings slurry in the conducted tests. However, in order to reduce the costs of the entire operation, it was necessary to control the density of the slurry. The article presents a prototype installation for measuring the efficiency of the solid phase of the “in situ” dredging process in real time. The installation was designed for the needs of dredging a deposit of tailings that were thickened in the natural sedimentation process, and which had a particle size of below 63 μm. The installation consists of a flow meter, a densimeter, and a section for measuring the head loss of the flow of the slurry. The applied methodology allows for the current assessment of the dredger’s operating parameters, which translates into a more effective–in terms of process efficiency–management of the dredger’s work.
20 November 2018 in Polish Journal of Environmental Studies
Climate change in recent years has caused considerable intensification of rainfall, and as a consequence an increase in flood waves flow rate. This article presents the verifying method of the dam overtopping risk under conditions of enlarged volumetric flood flow rates inflowing the storage reservoir. Values of the flow rate peaks were determined on the hydrological observations basis. The course of the hypothetical flood wave hydrograph was determined on the normalization and averaging basis of the 6 historical flood wave hydrographs. The flood routing analysis through the reservoir was numerically performed, with the assumptions of Puls’s method, for 6 scenarios with 2 flood flow rates and for 3 initial water levels in the reservoir. On the obtained results basis the dam overtopping hazard level was determined, and the necessity for reservoir water management changes was pointed out.