It is particularly important to study the strength of unsaturated loess, and its accurate determination is crucial to the stability analysis of soil slope and foundation and calculation of earth pressure. In order to reveal the control mechanism of physical parameters on the shear strength of unsaturated loess, the intact and remolded loess were used as the research object; sandy silt, quartz flour, and quartz sand were used as contrast; the systematic direct shear tests of unsaturated loess, sandy silt, and quartz sand under different conditions of water content, dry density, and clay content were carried out. The results show that the cohesion, internal friction angle, and shear strength of unsaturated loess piecewise functionally decrease with the increase of water content, its shear strength increases linearly with the increase of dry density, and its internal friction angle shows an upward quadratic function relation with the increase of clay content. The law results of comparing sandy silt, quartz flour, and quartz sand with loess considering water content and dry density are the same; therefore, the equation of shear strength of unsaturated loess is proposed for practical engineering reference, and by the first derivative analysis of the equation, it is feasible to determine the control proportion of the three parameters on the shear strength of unsaturated loess. A stage‐like difference between the three control proportions is observed, depending on the combination variations of water content and clay content.
Tunnel excavation in water-rich and saturated loess layers often encounters a series of engineering disasters, including surface settlement, large deformations of surrounding rock, collapses, water inrushes, mud inrushes, and lining cracks. This paper presents an analogy of 16 cases of instability and collapse of surrounding rock during the excavation of water-rich loess tunnels in China’s loess regions. The weight of influence of various factors affecting the stability of surrounding rocks has been analyzed based on the Fuzzy Analytic Hierarchy Process (FAHP), addressing the engineering challenges encountered during the construction of the Tuanjie Tunnel. Measures such as deep well-point dewatering of the surface, reinforcement of locking foot anchors, and construction treatment with large arch feet are proposed. The effectiveness of these treatments is then monitored and analyzed. The results show that after 30 days of dewatering, the average water content of the surrounding rock decreased from 28.8% to 22.3%, transforming the surrounding rock from a soft plastic state to a hard plastic state. Phenomena such as mud inrushes at the tunnel face and water seepage through the lining are significantly reduced, and the self-stabilizing capacity of the surrounding rock is markedly improved. By optimizing the excavation method and enhancing support parameters, the construction progress rate for Grade VI surrounding rock has increased from 10–15 m per month to 40 m per month, validating the effectiveness of the proposed measures.
13 March 2026 in KSCE Journal of Civil Engineering