Kyung Min

Dr. Kyung Min


Research Focus & Metrics

Academic Career Length

36Years (1991-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
24 April 2006 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
CWChung-Hsiao Wang
Chung-Hsiao Wang
KMKyung Min
Kyung Min
The market uncertainties in the generation business in the U.S. electric power industry have increased the significance of two factors in generation planning: financial risks and managerial flexibilities. At the same time,numerous utilities have multiple generation planning projects that are interrelated with respect to their market values. For such utilities, in order to quantitatively address these two factors, in this paper, we develop and analyze a real options model for general n interrelated projects. Specifically, first, we derive a unique lattice process that approximates interrelated continuous processes for the evolution of values of projects and options (e.g., selling a constructed project). The steps of the approximation for n projects are presented progressively starting from two projects. Next, based on the lattice process, we investigate the impact of interrelation on the values of options. Then, we provide a backward dynamic programming model for optimal sequential decision making where the decisions are made over the options. Finally, managerial insights and economic implications are illustrated via numerical examples.

1 March 2008 in European Journal of Operational Research
Verified
Journal Article
Closed access
JLJie Li
Jie Li
KMKyung Min
Kyung Min
TOToshitsugu Otake
Toshitsugu Otake
TVTimothy Van Voorhis
Timothy Van Voorhis

1 January 1998 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
MYMing-Jong Yao
Ming-Jong Yao
KMKyung Min
Kyung Min
Extreme weather conditions such as ice storms often cause significant damage to electric power transmission and distribution systems and result in large-scale power failures. In such cases, electric utilities need to repair the transmission and distribution systems as expeditiously and economically as possible. In this paper, for the electric utilities, the authors present three mathematical goal programming models: (1) a tactical model that provides the optimal repair-unit dispatch plan after a forecast of severe weather conditions; (2) a short-term strategic model that provides the optimal repair-unit location plan under normal weather conditions; and (3) a long-term strategic model that provides the optimal number of repair units. These models will assist electric utilities to locate and dispatch repair units and to restore the transmission and distribution failures efficiently. The authors illustrate some features of these models with a numerical example. Finally, a comparative study shows how these models could be more efficient than a modified conventional model

1 August 2005 in Telematics and Informatics
Verified
Journal Article
Closed access
SMSasidhar Malladi
Sasidhar Malladi
KMKyung Min
Kyung Min

5 September 2013 in IEEE Transactions on Engineering Management
Verified
Journal Article
Closed access
WSWenbo Shi
Wenbo Shi
KMKyung Min
Kyung Min
In this paper, we consider a firm that leases a single product to a service provider under the assumption that this firm can decide when to replace the leased product and remanufacture it. The cost of remanufacturing is assumed to follow a geometric Brownian motion process, which is characterized by its drift and volatility. Under these assumptions, we construct and analyze a basic real options model for product remanufacturing. Specifically, we derive the remanufacturing cost threshold at which the remanufacturing option is exercised. We also perform extensive sensitivity analysis to examine how the remanufacturing cost uncertainty and other factors influence the remanufacturing decision. Furthermore, we present an extension where a remanufacturing subsidy and a disposal fee by the government are considered. The impacts of these economic instruments on the remanufacturing decision as well as on the environment are investigated.

25 June 2014 in International Journal of Production Research
Verified
Journal Article
Closed access
WSWenbo Shi
Wenbo Shi
KMKyung Min
Kyung Min