This paper presents the economic analysis and optimal energy management of a grid-connected MG that comprises renewable energy resources and different battery storage technologies with different characteristics such as initial charge, depth of discharge, and the number of charging/discharging cycles to minimize the total operating cost of the system by maximizing the benefits of BSS, minimizing the investment and replacement cost of BSS, and minimizing the operation and maintenance cost of DGs. Several constraints are considered, such as the output power limits of the distributed generators, the limits of power imported from or exported to the grid, load balance, and other sets of battery storage constraints. The general algebraic modeling system (GAMS) is used to solve the deterministic optimization problem. Second, stochastic optimization is used to solve the deterministic problem with market price uncertainty. Third, robust optimization using the information gap decision theory is presented to model the electric load uncertainty. The validity and effectiveness of the proposed solution are explained by comparing the results obtained by GAMS to the results obtained by other optimization techniques presented in the literature.
Recent advances in using renewable energy resources make them more accessible and prevalent in microgrids (MGs) and nano grids (NGs) applications. Accordingly, much attention has been paid during the past few years to design and operate MGs with high renewable energy sources (RESs) penetration. Energy storage (ES) is the crucial enabler for reliable MG operation to help MGs become more resistant to disruptions, particularly with the increased penetration of RESs. In this regard, this paper formulates a two-stage optimization framework to improve a grid-connected MG performance. Firstly, the optimal allocation decisions of the battery ES systems (BESSs) are provided to enhance the self-consumption rate of the RESs and the hosting capacity (HC) of the MG. Secondly, an operation strategy with the results (number, location, and capacity) of the BESSs obtained from the first stage is handled as an objective function to minimize the MG’s total operation cost. The IEEE 33-bus radial system is modified to act as the MG with high RESs penetration. The problem is solved using a recent swarm intelligence optimization algorithm called the Harris hawks optimization (HHO) algorithm. The proposed optimal operation strategy considers numerous constraints, such as the charge-discharge balance, number and capacity limitations of the BESSs, and the different technical performance constraints of the MG. The results obtained verify the proposed optimization framework’s effectiveness for grid-connected MGs and validate the benefits gained from the appropriate allocation of BESSs. The results also indicate that oversized storage or using many unneeded storage units may adversely influence the MG’s total power losses.
Recent developments have increased the availability and prevalence of renewable energy sources (RESs) in grid-connected microgrids (MGs). As a result, the operation of an MG with numerous RESs has received considerable attention during the past few years. However, the variability and unpredictability of RESs have a substantial adverse effect on the accuracy of MG energy management. In order to obtain accurate outcomes, the analysis of the MG operation must consider the uncertainty parameters of RESs, market pricing, and electrical loads. As a result, our study has focused on load demand variations, intermittent RESs, and market price volatility. In this regard, energy storage is the most crucial facility to strengthen the MG’s reliability, especially in light of the rising generation of RESs. This work provides a two-stage optimization method for creating grid-connected MG operations. The optimal size and location of the energy storage are first provided to support the hosting capacity (HC) and the self-consumption rate (SCR) of the RESs. Second, an optimal constrained operating strategy for the grid-connected MG is proposed to minimize the MG operating cost while taking into account the optimal size and location of the energy storage that was formerly determined. The charge–discharge balance is the primary criterion in determining the most effective operating plan, which also considers the RES and MG limitations on operation. The well-known Harris hawks optimizer (HHO) is used to solve the optimization problem. The results showed that the proper positioning of the battery energy storage enhances the MG’s performance, supports the RESs’ SCR (reached 100% throughout the day), and increases the HC of RESs (rising from 8.863 MW to 10.213 MW). Additionally, when a battery energy storage system is connected to the MG, the operating costs are significantly reduced, with a savings percentage rate of 23.8%.
At present, one of the essential steps in microgrids (MG) optimization models is to consider the uncertainty of variables such as the intermittency of renewable energy sources (RES), electrical demand alteration, and market price volatility. More recently, MGs have received increasing attention, which needs to manage the uncertainty associated with future changes and variations of network parameters. This paper presents an optimal stochastic model for scheduling grid-connected MG energy comprises dispatchable resources such as micro-turbine and fuel cell units, non-dispatchable resources such as photovoltaic and wind turbine systems and a battery storage system. The optimal daily energy scheduling is required to obtain the MG’s minimum operation cost over a 24-h horizon. The general algebraic modeling system (GAMS) is used to solve the optimization problem formulated in this work. Uncertainty of RESs, electrical demand, and market price are taken into account in the optimization model. The results obtained validate the effectiveness of the solution.
1 February 2023 in International Journal of Advanced Engineering and Business Sciences
The uncertainty of variables such as the intermittency of renewable energy sources (RES), electrical demand alteration, and market price volatility is considered an important issue in the optimization model of microgrids (MG). At present, MG has received growing interest, which needs to administrate the variation related to future changes. The main contribution of this study is to present a stochastic optimization approach for planning the electrical energy of MG considering the intermittency of RES, market price instability, and electrical demand variation. The optimal daily energy scheduling of the MG is required to minimize the pollutant emissions over a 24-h horizon. The general algebraic modeling system (GAMS) is used to solve the optimization problem formulated in this paper. In the suggested stochastic approach, uncertainty modeling of the uncertainty of RESS, electrical demand, and the market price is modeled by the well-known scenario approach, in which the fuzzy C-means (FCM) is employed to cluster the scenarios generated. For the overlapped data set, the FCM gives the best result for it. Thus, FCM operates well than the standard hard clustering algorithm. The results obtained validate the effectiveness of the solution.