In view of problems such as the narrow efficiency area, large hydraulic vibration area, pressure pulsation, and serious sediment wear of turbines at the Futang hydropower station, the technical transformation of turbine runners was carried out by modifying the blade shape and increasing the blade thickness, and a combination of numerical simulations based on shear stress transport k–ω turbulence model and tests was adopted to improve the operational stability of power station units. Calculation and testing demonstrate an enlargement of the high‐efficiency zone. Specifically, the optimal efficiency of the runner increases by 0.37%, while the rated efficiency rises by 0.19%. Significant reductions are observed in pressure pulsation within the draft tube and vaneless area decrease of approximately 50%. There is a high‐frequency pressure pulsation in the vaneless zone and the runner under low‐load conditions, and the influence of dynamic and static interference gradually weakens with the increase of opening. The draft tube is prone to eccentric vortex bands under partial working conditions, which causes the unit to be affected by low‐frequency pulsation. This optimization also leads to a notable decrease in runner blade wear, with the maximum sand and water velocity reduced from 45 to 40 m/s, resulting in a 30% reduction in sand wear. Moreover, there is a substantial enhancement in the runner's stiffness, with the thickness of the blade near the high stress area of the upper crown and lower ring increasing by over 50%, and the weight of each individual blade increasing by more than 50%. These research findings validate that modifying the runner blade effectively improves flow patterns, reduces eddy current generation, minimizes pressure pulsation, widens the high‐efficiency zone, decreases wear, and enhances the operational stability of the unit. The technical transformation method and research results of this study have important guiding significance for similar technical transformation of other power stations
With the development of a power system predominantly reliant on new energy sources, turbine generator sets are increasingly required to operate under wide load conditions, resulting in numerous unstable flow phenomena and substantial economic losses for power stations. This study employs the Shear Stress Transport (SST) k-ω turbulence model to combine numerical simulations with experimental methods. It calculates the guide vane opening at the rated head of a Francis turbine and examines the internal flow field characteristics and pressure pulsations under various operating conditions. The findings indicate that the entropy production ratio in the draft tube is the highest among all load conditions, ranging from about 72.7% to 95.9%. Energy dissipation in the vaneless zone and the runner increases with greater opening. At 45% and 100% load conditions, the draft tube is mainly influenced by dynamic and static interference, single and double frequencies induced by runner rotation, and low-frequency fluctuations of the vortex and. Under 60% load conditions, pressure fluctuations in the draft tube are primarily caused by the eccentric vortex band, characterized by higher intensity and a frequency of 0.2 fn. Numerical results closely align with experimental observations. The findings provide essential guidance for ensuring the stable operation of power plant units.
A hydropower station, which has been in operation for over 50 years, has a penstock located in the plant’s open pipe section. Recently, concerns have been raised regarding the potential risks to the penstock’s safe operation due to wall thinning caused by abrasion. A series of stress tests, strength mathematical model analysis, and sediment erosion tests were performed on the penstock during turbine load rejection events. A stress and strain monitoring system for the steel pressure pipe was developed, enabling real-time monitoring and providing a warning function. The current wall thickness of the steel pressure pipe is about 28 mm. The results indicate that a pipe rupture is unlikely under any load rejection scenario. However, if the wall thickness is reduced to around 24 mm, the maximum equivalent stress of the pipe will approach the safety limit during load rejection. The sediment erosion test showed an erosion rate of 3.509 × 10–5 mm/h at an average sediment concentration of 0.63 kg/m3. Assuming no other factors, such as an increase in river sediment concentration, and based on the design specifications of the steel pressure pipe and the annual average sediment concentration of 0.63 kg/m3, it is projected that the open pipe section can be operated for about 19 years before the wall thickness reaches 24 mm. It is recommended that once the wall thickness reaches 24 mm due to erosion or other factors, the pipeline system undergoes maintenance or replacement. The findings provide significant guidance for the operation of similar power stations.