The Nakdong River Estuary Barrage (NREB) prevents salt-water intrusion but causes sedimentation problems in the Lower Nakdong River in South Korea. Its mitigation requires mechanical dredging to maintain the flood conveyance capacity during typhoons. This analysis focuses on the possibility of replacing mechanical dredging with sediment flushing through gate operations changes at NREB. The new approach first defines sediment flushing curves as a function of river stage and discharge. The feasibility of flushing is then assessed from the comparison of the flushing curves with the flow duration curves. The detailed analysis of long-term simulations using a quasi-steady numerical model provides detailed simulation results. The model applications from 1998 to 2003 incorporate tidal effects at 15-min intervals and also include major floods caused by typhoons Rusa in 2002 and Maemi in 2003. Accordingly, about 54% of the mean annual dredging volume could be eliminated by sediment flushing at NREB. The model also quantified the flood stage differences for sediment flushing operations with and without dredging. The resulting stage difference at NREB during floods would be less than 30 cm.
For the improvement of the conventional stage-discharge curve equation based on just stage, this study proposed a method to estimate river discharge using hydraulic characteristics, such as hydraulic radius, bed slope, depth, etc. Hydraulic gradients in Manning’s Equation and Chezy’s Equation, both of which are among mean velocity equations, were computed using those characteristics. For that computation, hydrological data actually measured in a laboratory channel and a natural open channel from the Albert University Report were used. And then, river discharge was calculated using the hydraulic gradients. For comparison with the conventional method of inversely calculating roughness coefficients, their power function was formulated. And river discharge estimated using the proposed method was compared with the corresponding one estimated using stage-discharge relations. As a result, the proposed method showed results more approximate to measured discharge. An analysis of discrepancy ratio distribution revealed that non-dimensional errors lied within the ranges of −0.2 to 0.23. This indicates that river discharge estimated using the proposed method showed some improvements in accuracy, compared with river discharge estimated using the conventional stage-discharge curve equation or inverse roughness coefficients.
1 September 2013 in KSCE Journal of Civil Engineering
The upstream channel of the Nakdong River Estuary Barrage (NREB) has experienced sedimentation problems requiring annual dredging operation after the construction. The main purpose of sediment dredging is to prevent flooding during late summer. Numerical simulation and volume analysis using field surveying data for the Lower Nakdong River have been conducted to quantify the bed changes with and without dredging operation and to analyze the effectiveness of dredging at the NREB. As a result, it is presented that the bed change rate (sedimentation rate) after dredging is much faster than the bed condition without dredging. The water surface rising of the maximum 10 cm was generated in case the dredging was not considered in the modeling. Volumetric analysis of bed changes using field surveying data presented that 41 percent of total sediment erosion was eliminated by natural flushing and 59 percent was dredged in the field. Because it is noticeable that dredged section is redeposited rapidly after dredging during low flow through the 2D simulation, it is expected that most of total sediment erosion (at least more than 41% of total sediment erosion) is caused by natural flushing due to the floods. Therefore, it is highly recommended to use natural flushing or intentional sluicing techniques for sedimentation control methods at the NREB.
The Nakdong River Estuary Barrage (NREB) was constructed in 1987 to prevent saltwater intrusion and to provide the sustainable water supply in the upstream channel of the NREB. The upstream channel of the NREB has experienced sedimentation problems requiring annual dredging operation after the construction. The main purpose of sediment dredging is to prevent flooding during late summer. According to the past records, the annual average dredging volume is about 524,170 m3 in the upstream channel of the NREB. Fluvial changes and sedimentation problems have been continued due to urbanization and development in the watershed as well as construction and management (sediment dredging) of the NREB. However, the sufficient field monitoring and researches for sedimentation characteristics and bed changes have not been performed after construction of the NREB. Therefore, bed elevation changes for 14 years (1990–2003) after construction of the NREB were analyzed using the Hec-6 model and relatively short term changes of bed elevation were simulated using RMA2 and SED2D programs with field data to review the superficial changes. Field survey before and after sediment dredging was conducted at various points of time to examine the natural flushing effect of sediment by moderate and high discharge before flood season (late July to early September) during low tide.
Wave overtopping happens when the crest of the breakwater is lowered below the maximum water surface elevation. Thus the estimation of the head of rubble mound breakwater stability of wave overtopping has become an essential part of the design of breakwaters. Head of rubble mound conditions within Busan Harbor are influenced by a range of factors, including wave overtopping, tidal exchange with near shore waters outside the harbor, the pattern of flow and circulation within the harbor, and surface discharge from surrounding lands during heavy rainfall events. This research focused on comparing the wave overtopping data measured during the laboratory model tests of the double layer Tetrapod (16 and 20 ton) effects on head of rubble mound stability. The model tests showed that the overtopping volume increases with the increase of wave height and decrease of freeboard and size of tetrapod. Consequently, head of rubble mound in medium case of overtopping were suitable for design.