The subject of the research is the investigation of the behavior of railway tracks in places with a significant change in the stiffness of the track. These parts can be designed from various structural elements and their materials, and this mainly results in a height change of the track level during its operation. These transition zones are monitored and expertly examined to detect undesirable deformations of the geometrical position of the track caused by the trains running. The transition zones are at the points where the fixed track transitions to the classic track bed, in our case it is their combination with bridge structures, especially at their supports. In Slovakia, under the conditions of the Railways of the Slovak Republic, the issue is topical within the framework of the modernization of trans-European railway corridors. The results of experimental measurements and their analysis will provide relevant data for subsequent research solutions for their new numerical modelling, which will ensure a smooth passage through these points of change without height fluctuations, vibrations, and shocks from the wheels of train sets.
Transition zones are located at points on a track where there has been a change in the main composition of the railway infrastructure; as such, there are many sections that undergo a sudden change in the stiffness of the structures built. When trains are running, a longitudinal shockwave is created by the wheels, hitting these building objects with a greater stiffness and deforming the surroundings of these zones. The greatest amount of attention should be paid to the transition points from the fixed track to the classic track with a track bed, including objects of the railway substructure, such as bridges and portals of tunnels. As part of the research on the main corridor lines, long-term inspection and monitoring studies were carried out using a trolley with a continuous measurement system; height changes in the deflections of rails are evidence of their behaviour. The measurements took place on a fixed track and a track with ballast. The changes in the height jumps between the fixed railway track and the track with a gravel bed are significant. These height deflections allow designers to develop new, more durable construction designs.
The subject of the research is the investigation of the behavior of railway tracks in locations with a significant change in the stiffness of the track. These locations can be designed from various structural elements and their materials, and this mainly results in a height change of the track level during its operation. These transition zones are monitored and expertly examined in order to detect undesirable deformations of the geometrical position of the track caused by the trains running. The transition zones are at the points where the fixed track transitions to the classic track bed, in our case it is their combination with bridge structures, especially at their supports. In Slovakia, under the conditions of the Railways of the Slovak Republic, the issue is topical within the framework of the modernization of trans-European railway corridors. The results of experimental measurements and their analysis will provide relevant data for subsequent research solutions for their new numerical modeling, which will ensure a smooth passage through these points of change without height fluctuations, vibrations, and shocks from the wheels of train sets.
Transition zones are in the places on the track with a change in the main composition of the railway infrastructure. There are many sections with a sudden change in the stiffness of the structures built. When the trains are running, a longitudinal shock wave is created from the wheels, which hits these building objects with a higher stiffness and deforms the surroundings of these zones. The most outstanding attention should be paid mainly to the transition points from the fixed track to the classic track with a track bed, including objects of the railway substructure such as bridges, portals of tunnels, etc. As part of the research sections on the main corridor lines, a long-term inspection and monitoring were carried out using the KRAB trolley with a continuous measurement system. Height changes in the deflections of rails are evidence of their behaviour. The measurements took place on a fixed track and a track with a ballast. Changes in the height jumps between the fixed railway track and the track with a gravel bed are significant and have been recorded since the tracks were put into operation. These certain height deflections allow designers to develop new, more durable construction designs.