Shitan Gu

Dr. Shitan Gu

orcid

Research Focus & Metrics

Academic Career Length

9Years (2018-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
1 April 2019 in Journal of Central South University
Verified
Journal Article
Closed access
PDF file
BJBang-You Jiang
Bang-You Jiang
SGShitan Gu
Shitan Gu
LWLian-Guo Wang
Lian-Guo Wang
GZGuang-Chao Zhang
Guang-Chao Zhang
WLWen-Shuai Li
Wen-Shuai Li

19 May 2022 in Journal of Central South University
Verified
Journal Article
Closed access
PDF file
WLWen-Shuai Li
Wen-Shuai Li
BJBangyou Jiang
Bangyou Jiang
SGShitan Gu
Shitan Gu
XYXu-Xu Yang
Xu-Xu Yang
FSFaiz U. A. Shaikh
Faiz U. A. Shaikh

26 April 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
SGShitan Gu
Shitan Gu
CCChangpeng Chen
Changpeng Chen
BJBangyou Jiang
Bangyou Jiang
Ke DingKe Ding
Ke Ding
HXHuajian Xiao
Huajian Xiao
Ensuring the stability of surrounding rock while conducting pressure relief is key to roadway stability control and preventing rock burst. In this paper, segmented enlarged-diameter borehole destressing technology is proposed. The stress distribution around the borehole is analysed based on the theory of elasto-plastic mechanics, and the mechanism of pressure relief for segmented enlarged-diameter boreholes is studied. Secondly, The effects of the diameter of enlarged-diameter section, length of the enlarged-diameter section, and borehole space on pressure relief and roadway deformation were investigated. Finally, the optimal drilling parameters for Tangkou coal mine 6307 working face are analysed. The key parameters of segmented enlarged-diameter borehole pressure relief technology for the 6307 working face were determined and applied in field practice. Field monitoring results showed that the accumulated energy can be effectively reduced using segmented enlarged-diameter pressure relief boreholes, effectively controlling roadway deformation and providing reference for rock burst prevention and roadway stability control.

22 November 2018 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
KDKe Ding
Ke Ding
SGShitan Gu
Shitan Gu
JGJiaxing Guo
Jiaxing Guo
DGDong Gu
Dong Gu
ZLZheng Liu
Zheng Liu
BWBaozhen Wei
Baozhen Wei

11 December 2018 in Geotechnical and Geological Engineering
Verified
Journal Article
Closed access
PDF file
SGShitan Gu
Shitan Gu
WZWei Zhang
Wei Zhang
BJBangyou Jiang
Bangyou Jiang
CHChengcheng Hu
Chengcheng Hu

8 March 2022 in Sustainability
Verified
Journal Article
Open access
PDF file
BJBangyou Jiang
Bangyou Jiang
MDMingjun Ding
Mingjun Ding
WLWenshuai Li
Wenshuai Li
SGShitan Gu
Shitan Gu
HJHongguang Ji
Hongguang Ji
Rockburst disasters frequently occur in deep tunnels excavated by TBM (tunnel boring machine) under complex geological conditions in western China. Using FLAC3D, the characterization of a three-dimensional numerical model of a compound stratum tunnel excavated by TBM is conducted, based on a water transport project in Shanxi Province. Then, the characteristics of rockburst in deep hard and soft compound stratum tunnels excavated by TBM are revealed, and the energy criteria of the rockburst considering the rock brittleness are proposed. In addition, the prevention and control method of drilling pressure relief for rockburst has been investigated. Results show that: (i) the rockburst risk of compound stratum tunnel excavated using TBM is mainly in the upper-hard rock part, while there is no rockburst risk in the soft rock part; (ii) after the excavation of the tunnel, slight rockburst risk occurs first in the hard rock area of the tunnel vault, and then the rockburst risk gradually rises to the strong level at 7 m behind the working face, indicating the hysteresis of strong rockburst; (iii) the rockburst in the vault of the rock surrounding the compound stratum tunnel has the effect of forming the deepest area, gradually narrowing to both sides, showing a “V” shape, and the occurrence of rockburst may not be completed at one time; (iiii) borehole pressure relief can significantly reduce the rockburst risk of surrounding rock in a tunnel. The larger the borehole diameter and depth, the better the effect of rockburst prevention. In addition, the effect of borehole diameter is more significant than depth. The research results provide guiding references for the prevention and control of similar rockburst disasters in underground engineering.