Meng Lin Meng

Mr. Meng Lin Meng


Research Focus & Metrics

Academic Career Length

2Years (2025-Present)

(Calculated once Scilit publication data is synced: current year − year of first publication + 1)

Representative Publications

View All Publications
25 April 2025 in Applied Sciences
Verified
Journal Article
Open access
PDF file
MMMeng Lin Meng
Meng Lin Meng
MWMei Wang
Mei Wang
CWChenlong Wang
Chenlong Wang
YYYongkang Yang
Yongkang Yang
The great success of fully mechanized mining with a large mining height of 8 m and above in Mongolia and Shaanxi proves the feasibility of this technology. Although fully mechanized mining with a large mining height significantly increases the production capacity of mining areas, there are higher requirements for mining safety. Due to the special conditions of the 8 m coal seam in Huoxi Coalfield, the adoption of fully mechanized mining with a large mining height faces a serious problem of spalling. The key to whether complete equipment for fully mechanized mining with a large mining height can be adopted lies in the possibility to reduce such risks. In this paper, the mechanism of spalling on the 8 m fully mechanized mining face in Huoxi Coalfield is analyzed through theoretical analysis, numerical calculations and comparison of on-site data, and a “one point four zone” comprehensive evaluation method for coal seam at the front end of the working face is established based on the failure characteristics of the coal seam; according to the numerical simulation test results, it is believed that the presence of a dirt band in the middle and upper parts of the coal seam has a positive effect on the control of spalling; the overburden structure of Huoxi Coalfield exhibits the changes in “cantilever-instability-hinge”, and there is a risk of caving before the mining face, which exacerbates spalling; the advance blasting roof cutting of the working face has a significant effect on controlling the spalling of production coal faces. This research provides a theoretical basis and engineering reference for the treatment of spalling in fully mechanized mining with a large mining height in Huoxi Coalfield.