The IWA Anaerobic Digestion Model No.1 (ADM1) was presented in 2002 and is expected to represent the state-of-the-art model within this field in the future. Due to its complexity the implementation of the model is not a simple task and several computational aspects need to be considered, in particular if the ADM1 is to be included in dynamic simulations of plant-wide or even integrated systems. In this paper, the experiences gained from a Matlab/Simulink implementation of ADM1 into the extended COST/IWA Benchmark Simulation Model (BSM2) are presented. Aspects related to system stiffness, model interfacing with the ASM family, mass balances, acid-base equilibrium and algebraic solvers for pH and other troublesome state variables, numerical solvers and simulation time are discussed. The main conclusion is that if implemented properly, the ADM1 will also produce high-quality results in dynamic plant-wide simulations including noise, discrete sub-systems, etc. without imposing any major restrictions due to extensive computational efforts.
In the paper three linear aeration controllers that can be easily implemented are presented and evaluated on the activated sludge process pilot plant. Controllers differ according to the information that is used about the process, which can be oxygen in the last aerobic reactor, ammonia in the last aerobic reactor and ammonia in the influent. The aeration controllers that are addressed are: oxygen cascade PI controller, ammonia cascade PI controller and ammonia feedforward-cascade PI controller. Experiments show that, in comparison with the oxygen cascade PI controller, the ammonia cascade PI controller allows better control of effluent ammonia and airflow savings of around 23%, while the ammonia feedforward-cascade PI controller gives the best reduction of ammonia peaks and can save up to 45% of the airflow.
In this paper, implementation of the Benchmark Simulation Model No 2 (BSM2) within Matlab-Simulink is presented. The BSM2 is developed for plant-wide WWTP control strategy evaluation on a long-term basis. It consists of a pre-treatment process, an activated sludge process and sludge treatment processes. Extended evaluation criteria are proposed for plant-wide control strategy assessment. Default open-loop and closed-loop strategies are also proposed to be used as references with which to compare other control strategies. Simulations indicate that the BM2 is an appropriate tool for plant-wide control strategy evaluation.
In this paper a model predictive controller (MPC) for ammonia nitrogen is presented and evaluated in a real activated sludge process. A reduced nonlinear mathematical model based on mass balances is used to model the ammonia nitrogen in the activated sludge plant. An MPC algorithm that minimises only the control error at the end of the prediction interval is applied. The results of the ammonia MPC were compared with the results of the ammonia feedforward-PI and ammonia PI controllers from our previous study. The ammonia MPC and ammonia feedforward-PI controller give better results in terms of ammonia removal and aeration energy consumption than the ammonia PI controller because of the measurable disturbances used. On the other hand, with the ammonia MPC, comparable or even slightly poorer results than with the ammonia feedforward-PI controller are obtained. Further improvements to the MPC could be possible with an improved accuracy of the nonlinear reduced model of the ammonia nitrogen, more sophisticated control criteria used inside the controller and the extension of the problem from univariable ammonia to multivariable total nitrogen control.
In this paper a simulated plant based on a wastewater treatment benchmark is used to evaluate a number of controllers. Feedforward-feedback controllers for dissolved oxygen set-point and external carbon flow, and feedforward controller for internal recycle flow are evaluated separately and altogether. In the feedforward parts of the controllers, static physical models are incorporated in the control laws. The feedback parts of the controllers are used to compensate for model approximations. A simulation study shows that feedforward-feedback control of the activated sludge plant is more successful than standard PI control in meeting the effluent standards and reducing operational costs.